Similar Projects
Rice Road Potable Water Main Extension
Post-Bid
Plant City, FL 33566

North B Street to Himes Avenue CIAC - Phase 5 Design-Build
Infrastructure
Post-Bid
$22,500,000 est. value
Tampa, FL 33646

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Main Improvements Design-Build
Term Contract
Results
Less than $50,000,000 est. value
Tampa, FL

Valves and Fire Hydrants Assessment and Replacement Program Design-Build
Infrastructure
Post-Bid
$25,000,000 est. value
Tampa, FL

CDBG University Square Water Replacement
Results
Temple Terrace, FL 33617

Water and Sewer Materials
Infrastructure
Post-Bid
$4,500,000 est. value
Tampa, FL

Sewer and Clean Waterline Construction, Babe Zaharias Golf Course
Results
Tampa, FL 33612

Spot and Full Circle Repair Clamps
Infrastructure
Post-Bid
Tampa, FL

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Belmar Gardens Water Main Replacement
Infrastructure
Post-Bid
$5,000,000 est. value
Tampa, FL

Dry Barrel Fire Hydrants (Sheltered Market Solicitation)
Results
Tampa, FL

Elliptical Concrete Culvert Pipe, Purchase And Delivery
Infrastructure
Post-Bid
Tampa, FL

PVC Pipe, Schedule 40/80/DWV (Sheltered Market Solicitation)
Results
Tampa, FL

Citywide Meter, Hydrant and Valve Installation and Replacement
Results
Tampa, FL

Last Updated 06/02/2022 02:56 PM
Project Title

Back Flow Preventer

Physical Address View project details and contacts
City, State (County) Tampa, FL   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description Quantity Price Sub Total Alternate Quote Value Lead Free 1" 975XL2 RPZ Back Flow - NO SUBSTITUTION 1 ea Lead Free 1"-1 1/2" 975XL2 RPZ Back Flow - NO SUBSTITUTION 1 ea Lead Free 2" 975XL2 RPZ Back Flow - NO SUBSTITUTION 1 ea Lead Free 1" Zurn 950XLT2 DBL CHK VL - NO SUBSTITUTION 1 ea Lead Free 1" - 1 1/2" ZURN 950XLT2 DBL CHK VL (MTR x FIPT) - NO SUBSTITUTION 1 ea Lead Free 2" ZURN 950XLT2 Dual CHK Valve (MTR x FIPT) - NO SUBSTITUTION 1 ea

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents