Similar Projects
Replace Switchgear at the Booster Fabrication Facility, Kennedy Space Center, FL
Alteration
Design
$5,000,000 to $10,000,000 est. value
Cape Canaveral, FL

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Council Chamber TV Lighting System
Alteration
Bidding
Titusville, FL

Rockledge ES Facility Renewal
Post-Bid
Rockledge, FL 32956

Specifications For Electrical Construction Repair To Damaged Utility Lines In Post Disaster Environment
Post-Bid
Moore Haven, FL

Replace Electric Transformers/Various
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Titusville Marina Wi-Fi Improvements
Results
Titusville, FL 32796

Generator Inspection, Maintenance, and Repair for Water Resources
Term Contract
Post-Bid
Titusville, FL 32796

ASCO 7000 Series Transfer Switch Replacement
Results
Cocoa, FL 32709

Hanger Fans
Term Contract
Post-Bid

Emergency Portable Generators
Term Contract
Results

MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Post-Bid
Less than $20,000,000 est. value

Small Generator (<350Kw) Preventative Maintenance & Repair Services - Term Contract
Term Contract
Results
Melbourne, FL

Heavy Duty Safety Switch and Fuses
Alteration
Post-Bid
Cocoa, FL 32922

Pre-Event Generator Installation
Results

Last Updated 04/11/2022 10:42 AM
Project Title

Replace Generators, South Substation (FAC 1395)

Physical Address View project details and contacts
City, State (County) Patrick AFB, FL 32925   (Brevard County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace four existing load control generators at South Substation with new generators that meet Reciprocating Internal Combustion Engines (RICE) National Emission Standards for Hazardous Air Pollutants (NESHAP) and other applicable air quality rules. Replacement generators shall produce not less than 6.6 MW of power to remain in compliance with existing Commercial/Industrial Load Control (CILC) Program agreement. The proposed project includes the following items: • Construction of concrete pads for the gen sets, control room, fuel tanks, and diesel exhaust fluid (DEF) tank • Installation of three (3) replacement Caterpillar Model 3516-HD, Factory Certified Tier 4 final generator sets with a combined power of 6,750 kW each enclosed in a housing structure • Installation of a DEF tank in a temperature controlled structure • Relocation of two existing dual compartment 500-gallon aboveground storage tanks (ASTs) • Relocation of existing 8,000-gallon AST • Fuel piping • Construction of an access roadway for fuel service and maintenance activities • Installation of elevated walkways • Installation of new control room with switchgear • Fence installation • Electrical connection • System integration with existing substation/FPL station • System start up and commissioning • Demolition of existing generator plant and site restoration

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents