Similar Projects
Spurgeon Lift Station and Force Main
New Construction, Infrastructure
Bidding
Lynnville, IN 47619

2021 Sanitary Sewer Rehabilitation
Infrastructure
Bidding
Warsaw, IN

Alexander Street Storm & Sanitary Sewer Installation
Post-Bid
Bremen, IN 46506

2020 Guaranteed Savings Contract Provider RFQ
Post-Bid
Muncie, IN 47302

Grace Street Storm Sewer Improvement
Results
Less than $565,000 est. value
Highland, IN 46322

Sanitary Sewer Extension at the Shelbyville AASF/Readiness Center
Results
Shelbyville, IN 46176

Sewer Construction Material Annual Requirements
Term Contract
Bidding
Fort Wayne, IN

Truesdell Lift Station and Sewer Extension
Post-Bid
La Porte, IN 46350

I-69 / SR 64 South East Quadrant Sanitary Sewer - Phase 1
Results
$470,000 to $530,000 est. value
Princeton, IN 47670

West Elwood Sanitary Sewer System
Infrastructure
Bidding
Elwood, IN

Lindley Ditch Stormwater
Post-Bid
Huntington, IN

2020 Sanitary Sewer Extensions-Contract A
Results
Decatur, IN 46733

2021 Roxanna Neighborhood Storm Study - Pipe Lining
Infrastructure
Bidding
East Chicago, IN

Graham Street Storm Sewer Replacement
Post-Bid
Franklin, IN 46131

Collection System Improvements
Results
$8,724,000 est. value
Monticello, IN 47960

Last Updated 12/06/2021 01:49 PM
Project Title

Sanitary Main and Three Phase Extension

Physical Address View project details and contacts
City, State (County) Greenfield, IN   (Hancock County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a sanitary main and associated manholes and electrical infrastructure for the extension of three phase electrical service. The scope of this project includes, but is not limited to: • Unclassified Excavation • Sanitary Main Installation • Sanitary Manhole Installation • Relocation of Existing Primary Service Line • Installation of Three Phase Electrical Infrastructure • Installation of Meter Rack and Gang Meters for 600Amp Service • Construction of Gravel Access Drive and Culvert • Purchase a Traffic Rated Electrical Junction Structure (Acquisition Only) • Removal of Existing Erosion Control Measures • Filling of the Existing Abandoned Sanitary Main with Grout • Installation of Underdrain Outlet Protectors • Cleaning of Existing Drainage Pipes & End Structures • Adjusting Fire Hydrant to Grade • Seeding, Sodding, and Topsoil

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents