Reported | 06/25/2021 12:00 AM |
Project Title | Saddlebrook Subdivision Storm Water Management System Improvements |
Physical Address | View project details and contacts |
City, State (County) | Chesterton, IN 46304 (Porter County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Installation of new storm water infrastructure to replace a failed septic system perimeter drain outlet tile and enhancements to an existing detention basin. The overall purpose of the project is to enhance the drainage and storm water management services provided to the surrounding property owners by improving the area`s storm water infrastructure. The project includes installation of storm sewer, via open trench construction, including stripping topsoil, excavation, bedding, laying storm sewer, placing initial backfill, haunching, placing final backfill, replacing topsoil, shaping, trimming, and finishing, and cleaning, inspecting, and testing; installation of storm sewer structures, including stripping topsoil, excavation, bedding, setting precast reinforced concrete drainage structures, placing adjusting rings and castings, backfilling, replacing topsoil, shaping, trimming, and finishing, and cleaning; installation of pipe underdrains, including stripping topsoil, excavation, placing filter fabric, placing bedding, laying perforated storm sewer pipe, placing backfill, replacing topsoil, and shaping, trimming, and finishing; and, drain tile investigations to confirm the location, size, depth, and alignment of existing perimeter drains and determine the treatments necessary to connect the existing drains to the new storm water infrastructure. It will also include enhancements to an existing detention basin, including stripping topsoil, excavation and/or fill, replacing topsoil, and shaping, trimming, and finishing; and, the grading of ditches and swales to create a swale along the route of the storm sewer. The project will also include the installation and maintenance of a construction entrance and construction access route and the restoration of all areas disturbed during the performance of the work, including storm sewer and pipe underdrain trenches, the detention basin, and other areas disturbed during the performance of the work |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |