Similar Projects
5th District Storm Water Improvements - Schneider Avenue and 171st Street
Infrastructure
Bidding
Hammond, IN 46320

Project D - Sewer Separation Projects - Part 1 and 2
Infrastructure
Bidding
Churubusco, IN

Alexander Street Storm & Sanitary Sewer Installation
Post-Bid
Bremen, IN 46506

2020 Guaranteed Savings Contract Provider RFQ
Post-Bid
Muncie, IN 47302

Grace Street Storm Sewer Improvement
Results
Less than $565,000 est. value
Highland, IN 46322

8th & Ohio Drainage Improvement
Results
Jeffersonville, IN 47130

Sanitary Main And Three Phase Extension
Infrastructure
Bidding
Greenfield, IN

Lindley Ditch Stormwater
Post-Bid
Huntington, IN

Southeastway Septic System
Results
$70,000 to $80,000 est. value
Indianapolis, IN 46225

2021 Doughty Road Stormwater Improvement
Infrastructure
Bidding
Lawrenceburg, IN 47025

Graham Street Storm Sewer Replacement
Post-Bid
Franklin, IN 46131

Lakeside Sewer Relocation
Results
La Porte, IN 46350

Stormwater System Improvements
Post-Bid
Knightsville, IN

Montgomery Avenue and Storm Line
Results
$1,000,000 est. value
Clarksville, IN 47129

Helmsburg Stormwater Improvements
Post-Bid
Nashville, IN 47448

Reported 06/25/2021 12:00 AM
Project Title

Saddlebrook Subdivision Storm Water Management System Improvements

Physical Address View project details and contacts
City, State (County) Chesterton, IN 46304   (Porter County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new storm water infrastructure to replace a failed septic system perimeter drain outlet tile and enhancements to an existing detention basin. The overall purpose of the project is to enhance the drainage and storm water management services provided to the surrounding property owners by improving the area`s storm water infrastructure. The project includes installation of storm sewer, via open trench construction, including stripping topsoil, excavation, bedding, laying storm sewer, placing initial backfill, haunching, placing final backfill, replacing topsoil, shaping, trimming, and finishing, and cleaning, inspecting, and testing; installation of storm sewer structures, including stripping topsoil, excavation, bedding, setting precast reinforced concrete drainage structures, placing adjusting rings and castings, backfilling, replacing topsoil, shaping, trimming, and finishing, and cleaning; installation of pipe underdrains, including stripping topsoil, excavation, placing filter fabric, placing bedding, laying perforated storm sewer pipe, placing backfill, replacing topsoil, and shaping, trimming, and finishing; and, drain tile investigations to confirm the location, size, depth, and alignment of existing perimeter drains and determine the treatments necessary to connect the existing drains to the new storm water infrastructure. It will also include enhancements to an existing detention basin, including stripping topsoil, excavation and/or fill, replacing topsoil, and shaping, trimming, and finishing; and, the grading of ditches and swales to create a swale along the route of the storm sewer. The project will also include the installation and maintenance of a construction entrance and construction access route and the restoration of all areas disturbed during the performance of the work, including storm sewer and pipe underdrain trenches, the detention basin, and other areas disturbed during the performance of the work

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents