Similar Projects
American Legion Building
Addition - 1,988 SF
Design
Delafield, WI 53018

2021 Heiden Haus
Renovation, Addition
Bidding
Madison, WI 53705

Hillcrest Park Pavilion
New Construction
Bidding
Waukesha, WI 53186

Indianhead Park Beach House Remodel
Renovation
Post-Bid
Mukwonago, WI 53149

Maintenance of Parks Facilities and Structures
Post-Bid
Less than $85,000 est. value
Manitowoc, WI 54220

Firemen's Park Shelter
Results
Germantown, WI 53022

2020 Lakeside Park Pavilion Addition and Alterations
Renovation, Addition
Results
Less than $1,200,000 est. value
Fond du Lac, WI 54935

Limestone Ridge Outdoor Pool
New Construction - 4,384 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Fitchburg, WI 53719

Indoor Shooting Range
New Construction - 30,000 SF
Pending Verification
$8,000,000 est. value
Lake Geneva, Lyons, WI 53147

Shoot Point Blank
New Construction - 13,187 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Greenfield, WI 53228

Cato Falls and Walla Hi Park Shelters
New Construction
Bidding
Kiel, WI 53042

Park Pavilion and Site Improvements Design RFP
New Construction
Post-Bid
Appleton, WI 54913

Indoor Group Camp Remodel
Renovation
Results
Less than $200,000 est. value
Bagley, WI 53801

Rome Town Center New Entertainment Pavilion
New Construction
Bidding
Nekoosa, WI 54457

Torch Lake Campground Improvements - Phase 3
Post-Bid
Conover, WI

Last Updated 11/19/2020 09:14 AM
Project Title

Lincoln Park Fieldhouse Accessibility Renovation

Physical Address View project details and contacts
City, State (County) Manitowoc, WI 54220   (Manitowoc County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovate the existing first floor toilet rooms to meet ADA requirements and provide an accessible entrance to the Lincoln Park Fieldhouse facility.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents