Similar Projects
Treasure Island Elementary School Community Park - Construction - CP23-07 - North Bay Village
New Construction, Infrastructure
Conception
$2,703,546 CJ est. value
North Bay Village, FL 33141

115th Street Mixed-Use
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Miami Shores, FL 33161

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

RFP D/B - Design-Build-Finance Services for North Bulkhead Berths 1-6 Realignment
Infrastructure
Bidding
$241,935,484 CJ est. value
Miami, FL 33132

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Design-Build Services for Roadway Improvements to NE 2nd Avenue
Results
Less than $10,307,626 est. value
Miami, FL 33128

SR 826 - Palmetto Expressway Capacity Improvement Project (FPID)
Results
Miami Lakes, FL 33014

Alton Bay Condominium Tower / Miami Beach
New Construction, Infrastructure - 197,780 SF
Construction
$10,000,000 CJ est. value
Miami Beach, FL 33140

Alton Bay Condominium Tower / Miami Beach
New Construction, Infrastructure - 197,780 SF
Construction
$10,000,000 CJ est. value
Miami Beach, FL 33140

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

M-Tower
New Construction, Infrastructure, Renovation - 10,531 SF
Design
$170,000,000 CJ est. value
Miami, FL 33130

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Last Updated 04/27/2023 12:04 AM
Project Title

Roadway And Drainage Improvements

Physical Address View project details and contacts
City, State (County) South Miami, FL 33143   (Miami-Dade County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $172,828 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work specified in this Invitation to Bid (ITB) consists of furnishing all goods, materials, supplies, and services necessary to provide a completed project that meets all of the needs described in this Scope of Services and as otherwise described in this ITB (the "Work"). The Work is to be performed in accordance with specifications and the contract documents that are provided to the Contractor by the City herein, as well as in accordance with those plans, drawings and specifications that are required to be produced by the Contractor and that are approved by the City. The Work also includes but is not limited to keeping the Project site clean and safe; the furnishing all labor of the Contractor and the labor of all allowable subcontractors; providing dumpster(s) for cleanup and disposal; disposing of materials; providing all necessary engineering and architectural plans, drawings and technical specifications; all permits; all necessary equipment, including rental equipment, machinery, tools, transportation and freight; coordination with any other City contractor, subcontractors and utility companies (i.e. power, gas, water); erecting construction safety measures, including fencing, privacy screening and cones, and ensuring that the safety measure are in place at the end of each working day; root pruning and sod restoration at affected areas to the City's satisfaction; cleaning the construction site at the end of each working day; maintenance of traffic and hiring of off duty City police officer if required by the City; and any other goods and services necessary to perform all of the Work. Prior to any digging, Contractor must locate all underground utilities and other facilities as well as contacting Sunshine 811 to coordinate the process between excavators and member utilities in Florida so that the utilities can mark the approximate location of all their underground facilities, including power lines, telephone lines, pipes, and cables on construction site. In all cases, it is the responsibility of Contractor to obtain and pay for all licenses and other permits (including tree permits), provide signed and seal footing and foundation specifications for permitting, as well as all laboratory tests, engineering and architectural specifications, drawings and plans that are necessary to secure any and all permits and licenses required to complete Work. In addition, Contractor will be required to obtain, pay for and deliver to the City as-built plans for all of the Work. Permit fees are waived for permits required to be issued directly by the City. Permit fees charged by other government entities, if required, are the responsibility of the Bidder/Contractor; however, in all cases; it is the responsibility of Bidder/Contractor to secure any and all permits that may be required for this project. All work is to be completed in accordance with specifications, engineering construction drawings, and in accordance with the terms and conditions described in Attachments A and B, all federal, state and local requirements, guidelines and regulations included the Florida Building Code, the City Land Development Code, all applicable ordinances of Miami-Dade County and the City, and the Americans with Disabilities Act (ADA). If the Project involves a City park, the Contractor must comply with the City's public playground safety standards, rules, and guidelines. Work activity is limited to the hours from 7:00 a.m. through 6:00 p.m., on weekdays from Monday through Friday pursuant to Section 7-15 and 7-16 of the City Code of Ordinances. City has allocated a budget of $180,000 for this project in the Capital Improvements Budget for Fiscal Year 2022 – 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents