Similar Projects
Last Updated | 04/27/2023 12:04 AM |
Project Title | Roadway And Drainage Improvements |
Physical Address | View project details and contacts |
City, State (County) | South Miami, FL 33143 (Miami-Dade County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $172,828 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work specified in this Invitation to Bid (ITB) consists of furnishing all goods, materials, supplies, and services necessary to provide a completed project that meets all of the needs described in this Scope of Services and as otherwise described in this ITB (the "Work"). The Work is to be performed in accordance with specifications and the contract documents that are provided to the Contractor by the City herein, as well as in accordance with those plans, drawings and specifications that are required to be produced by the Contractor and that are approved by the City. The Work also includes but is not limited to keeping the Project site clean and safe; the furnishing all labor of the Contractor and the labor of all allowable subcontractors; providing dumpster(s) for cleanup and disposal; disposing of materials; providing all necessary engineering and architectural plans, drawings and technical specifications; all permits; all necessary equipment, including rental equipment, machinery, tools, transportation and freight; coordination with any other City contractor, subcontractors and utility companies (i.e. power, gas, water); erecting construction safety measures, including fencing, privacy screening and cones, and ensuring that the safety measure are in place at the end of each working day; root pruning and sod restoration at affected areas to the City's satisfaction; cleaning the construction site at the end of each working day; maintenance of traffic and hiring of off duty City police officer if required by the City; and any other goods and services necessary to perform all of the Work. Prior to any digging, Contractor must locate all underground utilities and other facilities as well as contacting Sunshine 811 to coordinate the process between excavators and member utilities in Florida so that the utilities can mark the approximate location of all their underground facilities, including power lines, telephone lines, pipes, and cables on construction site. In all cases, it is the responsibility of Contractor to obtain and pay for all licenses and other permits (including tree permits), provide signed and seal footing and foundation specifications for permitting, as well as all laboratory tests, engineering and architectural specifications, drawings and plans that are necessary to secure any and all permits and licenses required to complete Work. In addition, Contractor will be required to obtain, pay for and deliver to the City as-built plans for all of the Work. Permit fees are waived for permits required to be issued directly by the City. Permit fees charged by other government entities, if required, are the responsibility of the Bidder/Contractor; however, in all cases; it is the responsibility of Bidder/Contractor to secure any and all permits that may be required for this project. All work is to be completed in accordance with specifications, engineering construction drawings, and in accordance with the terms and conditions described in Attachments A and B, all federal, state and local requirements, guidelines and regulations included the Florida Building Code, the City Land Development Code, all applicable ordinances of Miami-Dade County and the City, and the Americans with Disabilities Act (ADA). If the Project involves a City park, the Contractor must comply with the City's public playground safety standards, rules, and guidelines. Work activity is limited to the hours from 7:00 a.m. through 6:00 p.m., on weekdays from Monday through Friday pursuant to Section 7-15 and 7-16 of the City Code of Ordinances. City has allocated a budget of $180,000 for this project in the Capital Improvements Budget for Fiscal Year 2022 – 2023. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |