Similar Projects
Take 5 Oil Change
New Construction - 1,432 SF
Conception
Less than $500,000 CJ est. value
Henderson, NV 89015

West Henderson Parks And Recreation, Phases 2 - 5 - PR247 - City Of Henderson
New Construction, Infrastructure
Conception
$84,000,000 CJ est. value
Henderson, NV 89015

Boulder Lodge Expansion
Addition, Demolition, Renovation, Infrastructure
Design
$9,600,000 CJ est. value
Henderson, NV 89015

Tropicana Grand Canyon Apartments
New Construction - 682 SF
Design
Las Vegas, NV 89147

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Post-Bid
$1,500,000 CJ est. value
Henderson, NV 89015

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Post-Bid
$1,500,000 CJ est. value
Henderson, NV 89015

Silverado Ranch Boulevard - Jones Boulevard To Arville Street - Phase A
Results
$7,851,626 to $8,678,112 est. value
NV

Nobila - Via Inspirada to Las Vegas Boulevard
Infrastructure
Results
$53,500,000 est. value
Henderson, NV

Touro University Parking Expansion Phase II
New Construction
Construction
Henderson, NV 89014

Inspirada Marketplace
New Construction - 39,460 SF
Construction
$10,000,000 est. value
Henderson, NV 89009

Dream Hotel Las Vegas
New Construction, Infrastructure - 27,000 SF
Pending Verification
$545,000,000 CJ est. value
Las Vegas, NV 89119

Dream Hotel Las Vegas
New Construction, Infrastructure - 27,000 SF
Pending Verification
$545,000,000 CJ est. value
Las Vegas, NV 89119

Burkholder Blvd - Warm Springs To Russell, Phase 2 - ST093 - City Of Henderson
Infrastructure
Conception
$6,600,000 CJ est. value
Henderson, NV 89015

Ashley Furniture Industrial Facility
New Construction, Infrastructure - 298,389 SF
Design
$32,000,000 CJ est. value
Las Vegas, NV 89148

Maverik #660
New Construction - 5,951 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Las Vegas, NV 89115

Last Updated 11/10/2022 04:15 PM
Project Title

Take 5 Oil Change / Henderson

Physical Address View project details and contacts
City, State (County) Henderson, NV 89014   (Clark County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 1,432 square foot oil change facility. The project appeared before the City of Henderson Staff Review on March 3, 2022. The project is subsequently scheduled to appear before the Planning Commission on April 14, 2022 and City Council on May 3, 2022. An architect has been selected. Information regarding a general contractor has not been disclosed.

Details

1,432 SF. Parking Spaces, 11 Parking Spaces.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents