Similar Projects
SoHi Apartments
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Salt Lake City, UT 84101

Pura Vita Senior Housing
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
West Jordan, UT 84088

Electrical and Communications Duct Bank from AOC to Gate 7
Infrastructure
Bidding
$300,000 CJ est. value
Salt Lake City, UT 84116

Loft 962
New Construction, Infrastructure - 23,433 SF
Bidding
$10,000,000 CJ est. value
Salt Lake City, UT 84101

Grasmere Park Site Improvement Project
Infrastructure
Post-Bid
West Valley City, UT 84119

Huntsman Mental Health Institute Utah Translational Research Facility
New Construction, Infrastructure - 185,000 SF
Post-Bid
$105,000,000 CJ est. value
Salt Lake City, UT 84108

20D: Kent Booster Pump Station Replacement Project Contractor Prequalification
Renovation
Results
West Valley City, UT 84120

Blakes Lambing Ground Guzzler Excavation
Infrastructure
Results
Salt Lake City, UT

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

Gate 39 Reconstruction
Infrastructure, Renovation
Construction
$2,127,962 CJ est. value
Salt Lake City, UT 84116

Thackeray Towns
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Sandy, UT 84070

Bueno Avenue Apartments
New Construction, Infrastructure
Pending Verification
$24,000,000 CJ est. value
Salt Lake City, UT 84102

At 2100 Apartments II
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Salt Lake City, UT 84115

RFQ Construction Manager - Division of Facilities Construction and Management (DFCM) Construction- University of Utah Health Sciences Campus Office Building
New Construction, Infrastructure
Bidding
$78,439,728 CJ est. value
Salt Lake City, UT 84132

Jack and Bore-Lift Station CM-GC
New Construction, Infrastructure
Post-Bid
Salt Lake City, UT 84129

Last Updated 11/18/2022 03:07 PM
Project Title

South Jordan City Riverfront Park Wells and Pump Station

Physical Address View project details and contacts
City, State (County) Riverton, UT 84065   (Salt Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 18, 2022, this project is expected to rebid in the future, however, a timeline has not yet been established. Proposal Q & A Ends - April 27, 2022 at 12:00 PM. The intent of this solicitation is to receive a proposal with a statement of qualifications (SOQ) from Contractors and a price to furnish all materials, labor, equipment, tools, supplies, transportation, and appurtenances for drilling, construction, developing, testing, and equipping of four (4) irrigation wells, construction of a pump station with wet well storage, three connections to the secondary system, and all associated piping and site work at 11129 South Riverfront Pkwy and surrounding area. Any questions regarding how to use the SciQuest program, including how to submit a bid, download and upload documents, etc. should be directed to sciquestadmin@utah.gov The City reserves the right to reject any Bid if the City believes that it would not be in the best interest of the project or the City. Without limitation, such rejection may be because the Bid is not responsive, or the Bidder is unqualified or of doubtful ability or the Bid or Bidder fails to meet any other pertinent standard or criteria established by the City, as solely determined by City The contractor is expected to complete the work within 350 days from date of Notice to Proceed. The City anticipates that a Notice to Proceed will be given on May 1, 2022 but reserves the right to change such date.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents