Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1020 over Branch of Saxman Run
Infrastructure, Renovation
Conception
$3,000,000 CJ est. value
New Kensington, PA 15068

Fairwood Manor Bridge
Infrastructure, Renovation
Design
$1,337,000 CJ est. value
Irwin, PA 15642

SR 4019 over Brush Creek
Infrastructure, Renovation
Design
$1,767,495 CJ est. value
North Huntingdon, PA 15642

Construction of the Penn Township Sports Park Phase 2
Infrastructure
Bidding
$3,000,000 CJ est. value
Penn Township, PA 15642

Resurfacing of County Roads No 3-Alon Way/Northmoreland Park Road/Northmoreland Parking Lots
Infrastructure
Bidding
$2,000,000 CJ est. value
Greensburg, PA 15601

DNA Laboratory Facility New Building PA State Police Greensburg - Phase 1
New Construction, Infrastructure - 50,000 SF
Post-Bid
$30,000,000 CJ est. value
Greensburg, PA 15601

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Waterline Relocation Project
Infrastructure
Results
PA

Waterline Relocation Project
Infrastructure
Results
PA

Kistler Place Mixed-Use
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Murrysville, PA 15632

High School Renovation - Hempfield Area School Board
New Construction, Infrastructure, Renovation
Pending Verification
$128,000,000 CJ est. value
Greensburg, PA 15601

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Salina Bridge
Infrastructure
Design
$23,212,754 CJ est. value
Bell Township, PA 15618

Mt. Pleasant Borough Gazebo Renovation
Infrastructure
Bidding
$85,000 CJ est. value
Mount Pleasant, PA 15666

Last Updated 05/16/2023 09:39 AM
Project Title

Sewer Rehabilitation Phase 3A & 3B

Physical Address View project details and contacts
City, State (County) Monessen, PA 15062   (Westmoreland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $5,382,383 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 16, 2023, project was awarded to Insight Pipe Contracting for Phase 3A with $1,693,493.75 and Municipal and Contractors Sealing Products for Phase with $3,688,889.00. Total awarded amount is $5,382,382.75. Sewer Rehabilitation Phase 3A Cured-in-Place Pipe (CIPP) rehabilitation of pipe sizes 8" to 24". Estimate: $5,000,000.00 This Project is funded through both a grant and loan provided by the United States Department of Agriculture, Rural Utilities Service (RUS). The Project includes the following Work: Phase 3A - Cured-in-Place Pipe (CIPP) rehabilitation of 10,170 linear feet of pipe with diameters ranging in size from 8 inches to 24 inches, three new manholes, and 458 vertical feet of manhole lining. The project includes CCTV and cleaning of the lines, laboratory testing, subsurface utility exploration, spot repairs as necessary, bypass pumping, and traffic control. The Project has an expected duration of the following calendar days: Phase 3A - 480 calendar days Sewer Rehabilitation Phase 3B Centrifugally Cast Concrete Pipe (CCCP) rehabilitation of pipe sizes 36" to 84". Estimate: $900,000.00 This Project is funded through both a grant and loan provided by the United States Department of Agriculture, Rural Utilities Service (RUS). Phase 3B - Centrifugally Cast Concrete Pipe (CCCP) rehabilitation of 5,795 linear feet of pipe with diameters ranging in size from 36 inches to 84 inches and eight new manholes. The project includes CCTV of the lines, cleaning of the lines, laboratory testing, subsurface utility exploration, spot repairs as necessary, bypass pumping, and traffic control. The Project has an expected duration of the following calendar days: Phase 3B - 480 calendar days Prospective Bidders may obtain or examine the Bidding Documents at the offices of the City of Monessen on Monday through Friday between the hours of 9:00 a.m. and 3:00 p.m. and may obtain copies of the Bidding Documents from the City of Monessen or W.E.C. Inc. as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Copies of the contract plans and documents in pdf format may be emailed upon receipt of a check in the amount of $150.00. Call (412) 257-8774 to arrange for mailing. This fee must be received by W.E.C. Inc. at 1370 Washington Pike, Bridgeville, PA 15017 prior to mailing of the documents, and no requests will be honored within five days prior to the bid opening date, Payments for contract documents are not refundable. Attention is called to the fact that not less than the minimum salaries and wages as determined by the U.S. Department of Labor and/or the Pennsylvania Department of Labor and Industry must be paid on this project; that the contractor must ensure that employees and applicants for employments are not discriminated against because of race, color, age, religion, sex or national origin; and that the Resident Employment and Training Requirements be observed. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. All inquiries or questions concerning this project must be made to Bob Nedzesky by e-mail (RNedzesky@WECengineers.com) or fax (412-257-8815). No telephone questions will be answered. Questions received less than seven days prior to the date for opening of Bids may not be answered. Bids may be held by the Owner for a period not to exceed 91 days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding of the contract(s). The City of Monessen reserves the right to reject any or all bids or to waive any informality in the bidding. Awards will be to the low bid for each project, not the combined low bid.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents