Similar Projects
AJ Katzenmaier Academy Roofing
Alteration
Bidding
North Chicago, IL 60064

Municipal Building Roof Repair
Alteration
Bidding
North Chicago, IL 60064

Roofing Envelope Services
Post-Bid

Multi-Tiered Guaranteed Savings Contract
Term Contract
Post-Bid
Grayslake, IL 60030

Water Reclamation Facility Roof Rehabilitation
Results
Mundelein, IL 60060

Bittersweet Club House Roof
Results
Gurnee, IL 60031

North Chicago CHS Roofing
Alteration
Bidding
North Chicago, IL 60064

Roofing Systems, Exterior Building Maintenance
Term Contract
Post-Bid

Replace Roofing Systems Statewide, Phase I
Results
Less than $2,000,000 est. value

Replacement of the Roof Covering and Gutter System
Alteration
Bidding
Lincolnshire, IL

2020 Roof Replacement
Post-Bid
North Chicago, IL 60064

Replace Roofing System Kiley Development Center
Results
Less than $500,000 est. value
Waukegan, IL 60085

Roofing Repair and Maintenance
Post-Bid

Roof Replacements at Mitchell Park and Pool
Results
Deerfield, IL 60015

Standing Seam Metal Roofing
Post-Bid
Highwood, IL 60040

Reported 12/07/2021 12:00 AM
Project Title

Roofing Repair

Physical Address View project details and contacts
City, State (County) Gurnee, IL 60031   (Lake County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Almond Campus - Repairs to the existing EPDM membrane along select areas of the roof perimeter experiencing wrinkling and tenting of the membrane. Inspect and repair all metal coping lap joints along all roof areas and as noted on plans. Roof repairs at approximately (20) separate areas of roof to halt existing water entry in designated areas as specified and detailed. Provide up to (10) exploratory openings at designated areas of roofing to investigate any damage to the roofing system. O'Plain Campus - Repairs to the existing EPDM membrane along select areas of the roof perimeter experiencing wrinkling and tenting of the membrane. Inspect and repair all metal coping lap joints along all roof areas and as noted on plans. Roof repairs at approximately (15) separate areas of roof to halt existing water entry in designated areas as specified and detailed. Provide up to (6) exploratory openings at designated areas of roofing to investigate any damage to the roofing system.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents