Similar Projects
GSU - Clarkston Building CC 2nd Floor Laboratory Cabinet Replacement
Alteration
Bidding
$800,000 est. value
Atlanta, GA 30303

Spray Foam Insulation
Alteration
Bidding
GA

Vacancy Rehab Services
Post-Bid
Montezuma, GA

Replacement All Kitchen Cabinets, Sinks, Countertops , and Plumbing in Thirty four (34) Units
Post-Bid
Americus, GA

Repair Exterior and Interior, Bldg 510
Results
$250,000 to $500,000 est. value
Dobbins Afb, GA

Fire Station 8 Remodel
Results
Less than $55,584 est. value
Holly Springs, GA 30115

Orsat at Fox Building Repairs
Renovation
Bidding
Decatur, GA 30034

Remodeling Services Carpet And Electrical
Post-Bid
Columbus, Midland, GA 31820

Design and Installation of Casework
Results
Less than $1,500,000 est. value
Atlanta, GA 30303

Major Building System Replacement - Multiple Schools
Term Contract
Bidding
Lithonia, Stonecrest, GA 30058

Willow Glen Apartments Fire Damage Unit Repairs
Post-Bid
Columbus, GA 31906

Paint Chip Mitigation
Results
GA 31547

Building M Renovation
Alteration
Bidding
Atlanta, GA 30310

Selective Improvements at Four Developments
Alteration
Post-Bid
$350,000 est. value
Metter, GA

Restroom Renovation North Metro Campus Building C
Results
Less than $67,137 est. value
Acworth, GA 30102

Last Updated 05/01/2022 11:58 PM
Project Title

Russell Building Interior Paint and Repairs

Physical Address View project details and contacts
City, State (County) Milledgeville, GA 31061   (Baldwin County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of interior prep and painting of the CMU walls in the (59) Resident Rooms; cut-out and re-caulking all window joints on the interior of the building, including Resident Rooms and Dayrooms; replacing door jamb armor guards; replacing existing Elevator rubber flooring with a 2’-0” x 2’-0” raised dome rubber tile; replacing damaged acoustical tile ceilings at windows; cleaning water streaks on wall armor under the Resident Room windowsills. All work is within the Russell Building on the GWVH campus.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 22 - Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents