Similar Projects
Rebuild Electric Underdrainage Pump
Renovation
Sub-Bidding
$100,000 CJ est. value
Pine Bluff, AR 71601

Madison County LMI Plumbing Hookup
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Saint Paul, AR 72760

Bodcaw Low and Moderate Income (LMI) Plumbing Hookup Project
Alteration
Post-Bid
$100,000 est. value
Bodcaw, AR

Campus Wide Water Fountain Replacement - Bid Package 1 Plumbing
Alteration
Post-Bid
$255,000 est. value
Jonesboro, AR

IDIQ General Maintenance at Pine Bluff Site Office
Term Contract
Results
Pine Bluff, AR 71601

Sub-Basin S004 Sewer Main Realignment, Rogers Avenue - Waldron to 56th Street
Infrastructure
Results
$1,256,295 CJ est. value
Fort Smith, AR 72903

Thibault Road Relocation
Infrastructure
Post-Bid
$300,000 CJ est. value
Little Rock, AR 72206

Highway 49 and North Oak Street Sewer Extension
Infrastructure
Results
$460,829 CJ est. value
Brookland, AR 72417

Pipe, Fittings, and Valves
Term Contract
Post-Bid
Paragould, AR 72450

8-Inch Waterline Replacement
Infrastructure
Results
$130,250 CJ est. value
Waldron, AR 72958

Sandy Beach Bathroom Improvements - Material Package - Plumbing
Term Contract
Post-Bid
Heber Springs, AR 72543

Wastewater Collection System Improvements Phase I - Lift Station and Force Main
Demolition, New Construction, Infrastructure
Results
$6,944,410 CJ est. value
Elkins, AR 72727

Hot Water Heater Replacement for 170 Dwelling Units
Renovation
Post-Bid
$400,000 CJ est. value
Springdale, AR 72764

MASTER METER GUY WATER WORKS
Infrastructure
Results
$238,250 CJ est. value
Guy, AR 72058

2" Galvanized Water Main Replacements Little Rock Phase 2 2023
Infrastructure
Post-Bid
$2,175,000 CJ est. value
Little Rock, AR 72201

Last Updated 02/20/2024 08:52 AM
Project Title

Wastewater System Improvements - Rebid

Physical Address View project details and contacts
City, State (County) Lake City, AR 72437   (Craighead County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $3,225,910 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project will consist of the construction and installation of a new headworks system, a new sequential batch reactor (SBR) treatment unit, a new post aeration system, a new UV disinfection system, and the removal and land application of the sludge in the existing sludge holding pond and other related appurtenances. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis. Bid security shall be furnished in accordance with the Instructions to Bidders. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term iron and steel products means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents