Similar Projects
New HVAC and Water Heaters at Houston Court and Fifth Avenue
Alteration
Bidding
Athens, AL 35611

Chiller Replacement at Craighead Elementary School
Alteration
Bidding
Mobile, AL 36605

J079-Chiller Plant Maintenance
Post-Bid
Montgomery, Tuskegee, AL 36083

J079-Chiller Plant Maintenance
Post-Bid
Montgomery, Tuskegee, AL 36083

AMR Gas Meter Project Material and Installation
Results
Childersburg, AL 35044

Public Works Building Mechanical Work
Results
Less than $126,868 est. value
Orange Beach, AL 36561

Chiller Replacement at Ella Grant Elementary School
Alteration
Bidding
Prichard, AL 36610

J065--Installation of New Medical Gas Isolation Valves
Post-Bid
Montgomery, AL

Annual Pricing Agreement for Water Source Air Handler Replacement Coils
Term Contract
Results
Less than $2,160 est. value
Auburn, AL 36849

Bottle Filler Stations and Installation
Alteration
Bidding
AL

UAB West Pavilion Basement and First Floor Domestic Hot Water Return Replacement
Post-Bid
Birmingham, AL 35294

CCC Boiler Replacement Project Decatur Campus
Results
Tanner, AL 35671

McCallum Basic Health Sciences Building Room 113A1 Chilled Water Meter Installation
Post-Bid
$140,000 to $150,000 est. value
Birmingham, AL 35233

McGee Hall Boiler Replacement
Results
Jacksonville, AL 36265

Eva School Chiller Replacement
Post-Bid
Eva, AL 35621

Reported 10/22/2021 12:00 AM
Project Title

Chemistry Building Add Boiler for Heating Water

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35205   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $100,000 to $125,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Outdoor natural gas-fired boilers will be added to the Chemistry Building to serve the existing building's HVAC hot water requirements. Two boilers will be installed on a new concrete pad on the south end of the building together with associated hot water pumps and piping. The new equipment will interface with the building's existing Building Automation System (BAS).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents