Similar Projects
New Wastewater Treatment Plant
New Construction
Design
$46,000,000 est. value
Charlestown, IN

Wellfield and System Improvements
Addition, New Construction, Renovation, Infrastructure
Design
$21,038,500 CJ est. value
Columbus, IN 47201

Waterworks Improvements New Water Supply Well, Water Treatment Plant Modifications, & SCADA
New Construction, Renovation, Infrastructure
Bidding
$210,000 CJ est. value
Saint Paul, IN 47272

Division III - Water Storage Tank Rehabilitation
Infrastructure
Bidding
$400,000 CJ est. value
Saint Paul, IN 47272

2021 WWTP Improvements
Renovation
Post-Bid
Windfall City, IN

Sanitary Collection System and WWTP Upgrades
Renovation, Infrastructure
Post-Bid
Elizabethtown, IN

Wadesville and Blairsville Sanitary Improvements - Contract A: Wastewater Treatment Plant
New Construction
Results
Mount Vernon, IN

Long Term Control Plan Phase III – Div B – WWTP Improvements
New Construction
Results
Paoli, IN

North Wastewater Treatment Plant - River Ridge Development Authority
New Construction, Infrastructure
Pending Verification
$42,000,000 CJ est. value
Charlestown, IN 47111

North Water Treatment Plant Backwash Pipe Lining
Infrastructure
Design
$300,000 CJ est. value
Huntington, IN 46750

WWTP UV Building
Renovation
Post-Bid
Princeton, IN

WWTP Improvements
Renovation
Results
Lowell, IN 46356

Guaranteed Savings Contract
New Construction
Post-Bid
Avon, IN

WWTP Improvements - Disk Filter Replacement
Renovation
Results
Berne, IN

Valparaiso City Utilities WWTF Ferrous Chloride Storage Improvements
Renovation
Post-Bid
Valparaiso, IN

Last Updated 04/21/2023 09:07 AM
Project Title

Water Treatment Plant Filters 13-20 Pipe Gallery Rehabilitation

Physical Address View project details and contacts
City, State (County) Evansville, IN 47708   (Vanderburgh County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,285,455 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the rehabilitation of existing Filters 13 through 20 filter gallery and pipe gallery at the existing Water Treatment Plant through the following improvements: 1. Lead paint abatement of filter gallery walls adjacent to filter beds. 2. Isolate pipe gallery from filter gallery to create separation of spaces to limit humidity in pipe gallery from filters. Isolation to generally include masonry walls between the pipe gallery and adjacent spaces. 3. Replace air handling and dehumidification unit for filter and pipe galleries. 4. Replace all electric actuators, control conduit and cabling for all actuators in the pipe gallery. 5. Cleaning and coating of all pipes and supports in pipe gallery. 6. Sump pump replacement. (*Place Bid in drop box located outside of Room 100. If drop box is locked, approximately 40 minutes prior to the scheduled meeting, the bid will only be accepted by an EWSU staff member in the scheduled meeting room prior to the scheduled meeting time.) Email questions regarding virtual access to eplans@ewsu.com. Question Deadline 01/24/2023

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents