Similar Projects
CHRL Pump Station 1A, 2 and 3
Infrastructure
Design
$630,000 est. value
WA

Buttes Well 2 Emergency Improvements
Infrastructure
Bidding
Orting, WA 98360

Erdahl Ditch Second Pump Replacement Project
Infrastructure
Bidding
$325,000 to $375,000 est. value
Fife, WA

Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

Condensate Pump 1 Alpha Refurbishment
Alteration
Post-Bid
Richland, WA

Water Station 5 Reservoirs and Pump Station
Infrastructure
Results
$28,250,000 est. value
Vancouver, WA 98687

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Rebid - Chrl Leachate Pump Stations 1A Electrical, 2 And 3 Upgrade
Term Contract
Bidding
$1,945,000 to $2,145,000 est. value
WA

Kayak Well Rehabilitation
Infrastructure
Post-Bid
$90,000 est. value
Stanwood, WA 98292

Well No. 6
Alteration
Results
$2,189,000 est. value
College Place, WA 99324

Kennedy Test Well
Infrastructure
Bidding
$700,000 est. value
Ridgefield, WA

Hanford Integrated Tank Disposition Contract
Alteration
Post-Bid
WA

Aurora 1160 Series Pump Refurbishment
Alteration
Results
Keyport, WA 98345

Flat Top Community Park Well Replacement and Hazard Elimination (Well No. 2) Well Drilling and Decommissioning
Infrastructure
Bidding
$500,000 est. value
West Richland, WA

Havana Well Station - Phase One
New Construction, Infrastructure
Post-Bid
Spokane Valley, WA

Reported 04/15/2022 12:00 AM
Project Title

Ginkgo Petrified Forest State Park - Well Replacement

Physical Address View project details and contacts
City, State (County) Vantage, WA 98950   (Kittitas County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $143,500 to $166,700
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Drilling a new potable water well at Ginkgo Petrified Forest State Park in the Wanapum Recreation Area. The Work shall include drilling the well, well test pumping, water quality sampling and analysis for use as a domestic source, installation of well casing, installation of well pump and motor, updating electrical controls for new well, connecting new well to existing water pressure distribution system, replacement of pressure tanks and associated interior piping, electrical service improvements, and selective demolition/abandonment of existing well.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents