Similar Projects
Guttering/Drain Systems for Residential Units
Renovation
Sub-Bidding
$200,000 CJ est. value
Saint Charles, MO 63301

Mississippi Floodwall ORS Pump Stations - Ladder Replacements
Renovation, Infrastructure
Sub-Bidding
$725,370 CJ est. value
Saint Louis, MO 63103

Plumbing Services
Term Contract
Post-Bid
Mexico, MO

Rockhill Steam Line Replacement
Renovation, Alteration
Post-Bid
$1,453,000 est. value
Kansas City, MO 64110

Mechanical/Plumbing /HVAC Insulation Services
Alteration
Results
Columbia, MO

District Wide Drinking Fountain/Bottle Filler Installation
Alteration
Results
Hazelwood, MO

Plumbing
Renovation
Construction
$16,000 CJ est. value
Saint Charles, MO 63301

Plumbing Services
Alteration
Post-Bid
MO

McCracken Road Dam Rehabilitation
Infrastructure
Results
$2,000,000 CJ est. value
Ozark, MO 65721

Pump and Triple Duty Valve Replacement - Hazelwood Opportunity Center
Alteration
Post-Bid
$30,000 est. value
Spanish Lake, MO 63138

Installation of Flow Meter
Infrastructure
Results
$126,365 CJ est. value
Saint Louis, MO 63103

Plumbing Services 2022
Term Contract
Post-Bid
Saint Louis, MO 63110

Eltora Wet Weather Storage Facility
Demolition, New Construction, Infrastructure
Results
$187,986 CJ est. value
Saint Louis, MO 63130

McClendon Ditch Sewer Improvements
Infrastructure
Post-Bid
$6,168,200 CJ est. value
Lees Summit, MO 64081

Water Main Improvements Hwy N & Z
Infrastructure
Results
$376,585 CJ est. value
Cottleville, MO 63366

Last Updated 06/24/2023 06:04 AM
Project Title

Whetstone Creek Ca Big Lake Spillway Structure Replacement And Dam Slope Improvements

Physical Address View project details and contacts
City, State (County) Williamsburg, MO 63388   (Callaway County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $701,382 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: From the I-70 Williamsburg Exit 161, take Route D north to the stop sign. Turn west and continue on Route D to County Road 1003. Go north 2 miles on County Road 1003 to the entrance. Whetstone Creek Conservation Area Big Lake Spillway Replacement, 76-01-15. The Project includes, but is not limited to: mobilization and demobilization, construction survey staking, information sign, erosion control, clearing, grubbing, site grading, earth dam excavation, storage of excavated material, fill placement and compaction, removal of existing spillway, construction of new steel spillway pipe, concrete inlet and outlet, steel trash rack, dewatering, cofferdam, lake drawdown, lake filling, rip-rap, rock lining, boulders, pipe gate, signs, and seed and mulch. Whetstone Creek Conservation Area Big Lake Dam Slope Improvements, 76-01-16. The Project includes, but is not limited to: mobilization and demobilization, construction survey staking, erosion control, clearing, grubbing, site grading, earth dam excavation, storage of excavated material, embankment drain, fill placement and compaction, dewatering, lake drawdown, lake filling, and seed and mulch.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents