Similar Projects
Combined Sewer Overflow 402-406 Wet Weather Improvements - City Of Cincinnati
Renovation
Conception
$14,018,000 est. value
Cincinnati, OH 45202

Bolton Plant Well #4 Replacement - City of Cincinnati
Infrastructure
Conception
$1,500,000 CJ est. value
Cincinnati, OH 45207

RMTP Clearwell #3 Construction
Renovation
Bidding
$400,000 CJ est. value
Cincinnati, OH 45230

Muddy Creek WWTP Thickening Replacement and Pumping Improvements
Renovation
Post-Bid
Cincinnati, OH 45233

Muddy Creek WWTP (Wastewater Treatment Plant) Thickening Replacement and Pumping Improvements
Renovation
Post-Bid
$6,376,900 est. value
Cincinnati, OH

Embshoff Woods Wastewater Improvements
Results
$219,213 est. value
Cincinnati, OH 45238

Little Red Schoolhouse STS Replacement
Renovation
Results
Cincinnati, OH 45243

Daly Road Treatment Facility Modifications - City of Cincinnati
Renovation
Conception
$443,100 CJ est. value
Cincinnati, OH 45224

Muddy Creek Wastewater Treatment Plant EHRT and Pump Station
Renovation
Post-Bid
$106,000,000 CJ est. value
Cincinnati, OH 45233

Mill Creek Wastewater Treatment Plant Dewatering Building Odor Control - City of Cincinnati
New Construction, Infrastructure
Conception
$7,965,000 CJ est. value
Cincinnati, OH 45204

Mill Creek WWTP Plant Influent and Headworks Odor Control
Renovation
Post-Bid
$1,832,000 CJ est. value
Cincinnati, OH 45202

MCWWTP Disinfection and Outfall - City of Cincinnati
Renovation
Conception
$1,113,900 CJ est. value
Cincinnati, OH 45202

MCWWTP High Rate Treatment Pump Station - City of Cincinnati
Renovation
Conception
$14,000,000 CJ est. value
Cincinnati, OH 45202

Mill Creek Wastewater Treatment Plant (WWTP) Disinfection Improvement - City of Cincinnati
Renovation
Conception
$1,907,200 CJ est. value
Cincinnati, OH 45204

Mill Creek Wastewater Treatment Plant (WWTP) Outfall Improvements - City of Cincinnati
Renovation
Conception
$447,000 CJ est. value
Cincinnati, OH 45204

Last Updated 12/26/2022 10:31 PM
Project Title

SCWWTP Thickening and Settlement Improvements

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45242   (Hamilton County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $4,252,355 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

ACC. NO. 78881 In the Work consists of expansion of thickening capacity at the plant, increase flexibility for plant operations, replace aging equipment, mitigate plant odors around gravity thickeners, and improve sludge settleability. The Work includes demolition, removal, replacement, installation of new equipment and/or modifications to existing equipment to the following areas and processes: Addition of openings at the water surface elevation and baffles to the aeration basins to mitigate foam trapping; Installation of aluminum flat panel cover on Gravity Thickener 2, connect Gravity Thickener 2 to odor control and install new WAS feed piping to Gravity Thickener 1; New precast valve vault; Demolition and removal of existing odor control system and installation of new carbon adsorption odor control system, new foul air ducting, and new instrumentation; demolition and removal of 4 existing thickened sludge pumps and installation of 4 new progressive cavity thickened sludge pumps; Building modifications to the Thickened Sludge Building and installation of new exhaust fan; Installation of VFD panels for existing WAS pumps. Questions on this project or any part of the Contract Documents and other project documents must be sent via e-mail to MSD.PROCUREMENT@cincinnati-oh.gov by the established deadline.The deadline for questions is 12:00 PM local time on Friday, December 2, 2022. The estimated cost of construction for this project is: $3,887,000 City reserves the right to reject any or all bids, to waive technicalities, or to advertise for new bids, if the best interests of the City will be promoted thereby. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Work of the Project includes expansion of thickening capacity at the plant, increase flexibility for plant operations, replace aging equipment, mitigate plant odors around gravity thickeners, and improve sludge settleability. The Work shall be performed for the City in accordance with the Contract Documents. The Work includes, but is not limited to, demolition, removal, replacement, installation of new equipment and/or modifications to existing equipment to the following areas and processes: 1. Aeration Basins a. Addition of openings at the water surface elevation (WSE) and baffles to the aeration basins to mitigate foam trapping. 2. Gravity Thickeners (GTs) a. Installation of aluminum flat panel cover on GT 2. b. Connect GT 2 to odor control. 3. Install new WAS feed piping to GT 1.Valve Vault a. Flow from the Secondary Clarifiers and the Aeration Basins will be directed to a new belowground precast valve vault from where it can be sent to either of the two gravity thickeners. The valve vault shall be an unclassified space with hatches and alternating tread stairs for access. 4. Odor Control a. Demolition and removal of existing odor control system and related miscellaneous equipment including water control panel and instrumentation. Demolition of existing odor control fan and ducting downstream of 14-inches by 6-inches FRP saddle connection. b. Installation of new carbon adsorption odor control system for treatment of foul air from gravity thickeners and sludge storage tanks. c. New foul air ducting to connect gravity thickener #2 into new odor control system, and new foul air ducting to connect existing foul air ducting from gravity thickener #1 and sludge storage tanks #1 and #2 to new odor control system. d. Associated instrumentation. 5. Thickened Sludge Building a. Demolition and removal of four existing thickened sludge pumps. b. Installation of four new progressive cavity thickened sludge pumps. c. Physical separation of upper and lower levels through the demolition and infill of an existing door opening at the upper level. d. New exhaust fan on unnoccupied lower level. 6. Waste Activated Sludge (WAS)/Return Activated Sludge (RAS) Pump Stations a. Addition of VFDs to existing WAS pumps in both pump stations. b. Installation of yard piping to route flow to GTs. 7. Recirculation Building a. Two VFD panels to be mounted in NEMA 4X enclosures Addendum #1-#2 have been issued as of 12-5-2022.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents