Similar Projects
Groffs Run Stream Restoration
Results
Lancaster, PA 17608

Horseshoe Trail Road T-831 Culvert Replacement
Results
$200,000 to $400,000 est. value
Reinholds, PA 17569

Creek Road Bridge
Results
$500,000 to $999,999 est. value
PA

Brick Mill Road Culvert Replacement
Results
PA

2020 Stream Resortation
Results
Lancaster, PA 17601

North Linden and East High Street Drainage Improvements
Bidding
Less than $25,000 est. value
Manheim, PA 17545

Precast Concrete Box
Bidding
New Holland, PA 17557

Sinkhole Repairs Between Milepost 199.26 and Milepost 312.03 in Berks, Chester, Cumberland, Dauphin, Franklin, Lancaster, Lebanon, York
Results

Mill Road (T-844) Culvert Replacement Project
Results
$200,000 to $400,000 est. value
Reinholds, PA 17569

Wastewater Treatment Plant Streambank Rehabilitation
Results
$25,000 est. value
Quarryville, PA 17566

Christian Street Mixed-Use Parking Garage - Micropiles
Results
$2,000,000 to $2,750,000 est. value
Lancaster, PA 17603

Shawnee Run Stream Restoration
Bidding
Less than $300,000 est. value
Columbia, PA 17512

Hollow Road Culvert Replacement
Results
Less than $75,000 est. value
New Providence, PA 17560

Mentzer Road (T-582) Pre-Cast Box Culvert
Results
Lampeter, PA 17537

Chestnut Street Ironville Drainage Improvements
Results
$160,000 est. value
Columbia, PA 17512

Last Updated 04/11/2019 08:02 AM
Project Title

Green Park Basin BMP Retrofit

Physical Address View project details and contacts
City, State (County) Manheim, PA 17545   (Lancaster County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $130,000 to $140,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The work will include, but not necessarily be limited to, grading, placement of clay liner, riprap, and seeding. a) Mobilization/Demobilization, including bonds and insurances (1 LS). b) Traffic Control (1 LS). c) Site grading including removal of existing concrete flow channel, clay liner installation, forebay construction, and topsoil placement, complete in-place (1 LS). d) R-5 riprap including geotextile and underlayment, complete in-place (120 SY). e) Outlet structure modification, complete in-place (1 LS). f) Seeding and mulching of basin, complete in-place (1 LS). g) Temporary E&S controls and permanent stabilization of disturbed areas outside of basin, complete in-place (1 LS). Project location: East side of Lefever Road between Green Park Drive and Willow Creek Drive.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents