Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Parkview High School - Cafeteria Modifications - LAN Cabling [Division 27]
Renovation
Bidding
$900,000 CJ est. value
Lilburn, GA 30047

Central Gwinnett High School - Classroom Renovations
Renovation
Post-Bid
Lawrenceville, GA 30046

Central Gwinnett High School Classroom Renovations
Renovation
Post-Bid
$3,000,000 CJ est. value
Lawrenceville, GA 30046

South Gwinnett High School- Kitchen/Cafeteria Renovations
Renovation
Results
Snellville, GA 30078

Dacula Elementary School and Dacula Middle School Classroom Renovations
Renovation - 88,584 SF
Results
Dacula, GA 30019

Jones Middle School - Addition and Modifications
Renovation, Addition
Construction
Buford, GA 30519

Hebron Christian Academy Building Addition
Addition
Construction
Dacula, GA 30019

Hebron Christian Academy Building Addition
Addition, Demolition, Infrastructure
Pending Verification
$600,000 CJ est. value
Dacula, GA 30019

Trickum Middle School Addition and Renovation
Addition, Demolition, Renovation, Infrastructure - 59,631 SF
Post-Bid
$7,000,000 CJ est. value
Lilburn, GA 30047

North Gwinnett High School East Addition
Addition
Results
Suwanee, GA 30024

Golder Material Lab Relocation
Renovation - 10,047 SF
Construction
Norcross, GA 30093

Additions and Renovations to the Bufford Middle School
Addition, Demolition, Renovation, Infrastructure - 33,106 SF
Post-Bid
$3,000,000 CJ est. value
Buford, GA 30518

Southern High School Field House
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Snellville, GA 30078

Duluth High School Duluth GA
Renovation
Post-Bid
Duluth, GA 30096

Last Updated 02/14/2023 02:14 PM
Project Title

Duluth High School Stem Engineering Lab

Physical Address View project details and contacts
City, State (County) Duluth, GA 30096   (Gwinnett County)
Category(s) Education, Laboratory
Sub-Category(s) Laboratory, Middle/Senior High School
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Any bidder may be required, at the discretion of the Owner, to furnish evidence satisfactory to the Owner that his proposed subcontractors have sufficient means and experience in the types of work called for to assure completion of the contract in a satisfactory manner. Any bidder that is disqualified may respond to the Owner in writing within 20 days of the Notice of Disqualification as to why the bidder feels that the disqualification is unfounded. The written appeal from the disqualified bidder will not change the decision already made on this project. However, a favorable appeal may open the way for the bidder in question to bid on future Gwinnett County Public School System projects Contract, if awarded, will be on a lump sum basis. The bid may not be withdrawn for a period of sixty (60) days after date of opening. Bids must be accompanied by a bid bond payable to the Gwinnett County Board of Education, in an amount equal to five percent (5%) of the Base Bid Performance Bond and Labor and Material Payment Bond, each equal to 100% of the Contract Sum will be required of the successful bidder. These bonds are to be executed by a Surety Company licensed to do business in the State of Georgia, be listed on "Department of the Treasury Circular 570" and have an A.M. Best Company rating of at least Class "A", with a Financial Size of VI or better. Bonds must be accompanied by letter stating company's current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement. Time is of the essence to the Contract performance. Notice to Proceed will be issued after the Pre-Construction meeting as soon as all required paper work such as Contracts, Bonds, Insurance, etc. are in order. Contractor shall mobilize within ten (10) days of Notice to Proceed. Work cannot start prior to Thursday, May 25, 2023 and must be substantially complete by Friday, July 21, 2023. The Owner will make payments to the successful Contractor upon receipt of requests for payments, having been certified by the Architect, as fully covered and shown in the plans and specifications. Retainage as prescribed in the specifications and General Conditions of the Contract will be withheld. The above description is an advertisement for the submission of bids which are to be considered as offers for performance of work by the submitting party. The Owner reserves the right to accept or reject any or all bids and to waive technicalities.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Furniture, Institutional Furniture, Laboratory Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents