Similar Projects
Langan Lake Dredging
Infrastructure
Conception
$4,000,000 CJ est. value
Mobile, AL 36602

Ball Healthcare Skilled Nursing Facility / Mobile
New Construction, Infrastructure
Design
$52,000,000 CJ est. value
Mobile, AL 36602

UMS Wright Prep School Classroom Building
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Mobile, AL 36607

Perch Creek Area Sanitary Sewer Trunk Line CIPP
Infrastructure
Bidding
$5,400,000 CJ est. value
Mobile, AL 36602

Mobile Area Water and Sewer Service (MAWSS) Eslava Creek Trunk Upgrades
Infrastructure
Bidding
$300,000 CJ est. value
Mobile, AL 36618

Alabama Cruise Terminal SPBB Gangway Improvements
Infrastructure
Post-Bid
$700,000 CJ est. value
Mobile, AL 36602

Alabama Cruise Terminal SPBB Gangway Improvements
Infrastructure
Post-Bid
$700,000 CJ est. value
Mobile, AL 36602

Water Supply Improvements Contract A -R. O. Water Treatment Plant (0.250 MGD) Contract B --R. O. Treatment Equipment
New Construction, Infrastructure
Results
$2,145,057 CJ est. value
Mobile, AL 36602

Jeff Hamilton Road at Johnson Road South and Johnson Road West Roundabout
Infrastructure
Results
$2,000,000 est. value
Mobile, AL 36695

Barry 8 Power Plant Natural Gas Unit
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Bucks, AL 36512

High-Tech Logistics Park / Mobile
New Construction, Infrastructure
Construction
$19,000,000 CJ est. value
Mobile, AL 36602

FGP Holdings Manufacturing Renovation
Addition, Demolition, Infrastructure - 100,000 SF
Pending Verification
$20,000,000 CJ est. value
Mobile, AL 36606

Medical School Building Expansion and Renovation - University of South Alabama
New Construction, Infrastructure
Pending Verification
$140,000,000 CJ est. value
Mobile, AL 36608

Canfor Southern Pines Sawmill Complex / Mobile County
New Construction, Infrastructure
Design
$210,000,000 CJ est. value
Axis, AL 36505

Fox Landing Boat Wash Facility- Civil Site Work
Infrastructure
Post-Bid
$200,000 CJ est. value
Semmes, AL 36575

Last Updated 08/22/2023 04:45 PM
Project Title

RFP - I-10 Mobile River Bridge Project

Physical Address View project details and contacts
City, State (County) Mobile, AL 36602   (Mobile County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,100,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 22, 2023, negotiations are underway with short-listed design builders. A firm timeline for award and construction has not been determined. *The closed solicitation has been included below for reference: This Request for Qualifications and Proposals ("RFQ/RFP"), as it may be amended, is issued by the Alabama Department of Transportation ("ALDOT") to seek competitive proposals (individually, a "Proposal" and collectively, "Proposals") for a progressive design-build contract that will consist of a Design-Build Agreement and related documents (the "Design-Build Agreement" or “DBA”). The DesignBuild Agreement will provide that the successful Proposer ("Design-Builder") shall develop, design, and construct (subject to the terms of the DBA) a new six-lane bridge with a minimum of 215 feet of air draft clearance across the Mobile River channel (the "Project"), with tolling of the bridge. The Project, together with a second separate progressive design-build project for the replacement of the two existing two-lane bridges across the Mobile Bay with two three-lane bridges built above the 100-year storm event maximum wave height (the "Bayway Project"), will address acute and growing congestion issues by increasing the capacity of I-10, providing a direct interstate route for hazardous material transport and minimizing adverse impacts to the maritime industries. The Project and the Bayway Project will also improve geometrics, enhance access to major industrial and freight destinations in the Mobile area, and facilitate economic growth. The Project and the Bayway Project extend approximately eleven miles through Mobile and Baldwin Counties, Alabama. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents