Reported 02/26/2022 12:00 AM
Project Title

Asbestos Abatement - CB Renovation

Physical Address View project details and contacts
City, State (County) Loveland, CO 80538   (Larimer County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. The Work includes the removal and disposal of approximately 2140 SF of asbestos containing floor tile and mastic to be removed from to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 2. The Work includes the removal and disposal of approximately 760 SF of asbestos containing mastic beneath non-asbestos containing floor tile to be removed from to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 3. This work includes the removal of 3 non-asbestos containing fittings (‘elbows/hangers/roof drains”) located within the containment area above the ceiling. Conrad Ball Middle School Base Bid – Phase II (6,650 SF) 4. The Work includes the removal and disposal of approximately 3,725 SF of asbestos containing floor tile and mastic to be removed from to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 5. The Work includes the removal and disposal of approximately 935 SF of asbestos containing mastic beneath non-asbestos containing overlay to be removed from to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 6. The Work includes the removal and disposal of approximately 1,990 SF of asbestos containing mastic beneath non-asbestos containing rubber overlay to be removed from to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. Conrad Ball Middle School Base Bid – Phase III (5,500 SF) 7. The Work includes the removal and disposal of approximately 5,500 SF of asbestos containing floor tile and mastic to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. Conrad Ball Middle School Base Bid – Phase IV (10,700 SF) 8. The Work includes the removal and disposal of approximately 9,550 SF of asbestos containing floor tile and mastic to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 9. The Work includes the removal and disposal of approximately 1,150 SF of asbestos containing floor tile and mastic beneath non-asbestos containing overlay to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 10. This work includes the removal of 4 non-asbestos containing fittings (‘elbows/hangers/roof drains”) located within the containment area above the ceiling. Conrad Ball Middle School Base Bid – Phase V (8,130 SF) 11. The Work includes the removal and disposal of approximately 7,365 SF of asbestos containing floor tile and mastic to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 12. The Work includes the removal and disposal of approximately 765 SF of asbestos containing mastic beneath one layer of non-ACM floor tile and one layer of of asbestos containing floor tile and mastic to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 13. This work includes the removal of 5 non-asbestos containing fittings (‘elbows/hangers/roof drains”) located within the containment area above the ceiling. Conrad Ball Middle School Base Bid – Phase VI (7,200 SF) 14. The Work includes the removal and disposal of approximately 7,140 SF of asbestos containing floor tile and mastic to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 15. The Work includes the removal and disposal of approximately 60 SF of asbestos containing mastic under non-ACM floor tile to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 16. The Work includes the removal and disposal of 3 non-asbestos containing fittings (‘elbows/hangers/roof drains”) located within the containment area above the ceiling. Conrad Ball Middle School Base Bid – Phase VII (6,600 SF) 17. The Work includes the removal and disposal of approximately 2,700 SF of asbestos containing floor tile and mastic to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 18. The Work includes the removal and disposal of approximately 2,260 SF of asbestos containing floor tile and mastic under non ACM overlay to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 19. The Work includes the removal and disposal of approximately 1,640 SF of asbestos containing mastic beneath one layer of non ACM floor tile to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 20. The Work includes the removal and disposal of 1 non-asbestos containing fittings (‘elbows/hangers/roof drains”) located within the containment area above the ceiling. Conrad Ball Middle School Base Bid – Phase VIII (2,200 SF) 21. The Work includes the removal and disposal of approximately 2,200 SF of asbestos containing floor tile and mastic to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 22. The Work includes the removal and disposal of 1 non-asbestos containing fittings (‘elbows/hangers/roof drains”) located within the containment area above the ceiling. Conrad Ball Middle School Base Bid – Phase IX (2,030 SF) 23. The Work includes the removal and disposal of approximately 1,700 SF of asbestos containing floor tile and mastic beneath one layer of non-ACM overlay to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 24. The Work includes the removal and disposal of approximately 330 SF of asbestos containing floor tile and mastic to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 25. The Work includes the removal and disposal of 1 non-asbestos containing fitting (‘elbows/hangers/roof drains”) located within the containment area above the ceiling. Conrad Ball Middle School Alternate Bid #1 – Phase X (3,050 SF) 26. The Work includes the removal and disposal of approximately 1,960 SF of asbestos containing floor tile and mastic to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 27. The Work includes the removal and disposal of approximately 1,090 SF of asbestos containing floor tile and mastic under non ACM overlay to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. Conrad Ball Middle School Base Bid – Phase XI (11,550 SF) 28. The Work includes the removal and disposal of approximately 2,210 SF of asbestos containing mastic under non-ACM floor tile to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 29. The Work includes the removal and disposal of approximately 9,340 SF of asbestos containing floor tile and mastic to be removed to a clean substrate. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative. 30. The Work includes the removal and disposal of 3 non-asbestos containing fitting (‘elbows/hangers/roof drains”) located within the containment area above the ceiling. Conrad Ball Middle School Base Bid – Phase XII (1,665 SF) 31. The Work includes the removal and disposal of approximately 1,665 SF of asbestos containing floor tile and mastic to be removed to a clean substrate. The material in this phase is in 7 different areas throughout the school and range in size from 80 Sf to 400 SF. The Contractor shall remove all floor tile, adhesives, mastics, and fillers to a clean substrate. The Contractor shall final wash the floor to remove any mastic remover residue, which would inhibit the installation of new floor finish, per the mastic remover manufacturer's directions. Dispose of all materials as ACWM. The Work shall be performed under full enclosure or secondary engineering controls, unless otherwise specified by Owner’s Representative.

Details

Division 02 - Existing Conditions, Asbestos Remediation, Asbestos Abatement.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents