Similar Projects
US 12/ Walla Walla River Bridge - Bridge Painting
Renovation
Conception
$2,365,000 est. value
Wapato, WA

I-5 / I-5 Over NE 78th St - Replace Expansion Joints
Infrastructure
Conception
$1,042,000 est. value
Tacoma, WA 98409

WA NPS BP Olym 2019(2) Olym Bridge Preservation
Renovation
Design
$1,000,000 to $2,000,000 est. value
Port Angeles, WA 98362

WA NPS BP Olym 2019(2) Olym Bridge Preservation
Renovation
Design
$1,000,000 to $2,000,000 est. value
Port Angeles, WA 98362

I-90, West Easton to Renslow Vicinity Bridge Deck Repair
Renovation, Infrastructure
Bidding
$1,250,000 to $1,500,000 est. value
Cle Elum, WA 98922

Dickey Crk Bridge
New Construction, Infrastructure
Bidding
$5,000,000 to $7,000,000 est. value
Cle Elum, WA

Wooten Wildlife Area Watson Lake Foot Bridge Installation
New Construction
Post-Bid
$120,000 est. value
Olympia, WA

Bridge Painting Kiwanis Beach
Renovation, Infrastructure
Post-Bid
Republic, WA 99166

Improvement of Arch Bridge on Lamar Road
Renovation, Infrastructure
Results
$1,304,776 est. value
Prescott, WA 99348

3rd Street SW And Lea Hill Bridge Deck Preservation
Renovation, Infrastructure, Alteration
Results
$700,000 to $900,000 est. value
Auburn, WA 98092

US 12/Snake River Vaughn Hubbard Bridge EB - Bridge Painting
Renovation, Infrastructure
Conception
$10,004,000 est. value
Pasco, WA 99301

SR 520/I-5 to Montlake I/C and Bridge Replacement Project
New Construction
Design
$725,000,000 to $775,000,000 est. value
Seattle, WA 98113

Addy Gifford and Blue Creek Bridge Deck Rehabilitation
New Construction, Infrastructure
Bidding
$50,000 est. value
Colville, WA

Auburn Station Pedestrian Bridge Stair Repair
Renovation, Infrastructure
Post-Bid
Auburn, WA 98001

Columbia County 2017 Bridge Rail (Turner and South Touchet Bridge Rail Update)
New Construction, Infrastructure
Results
$275,000 est. value
WA

Reported 06/21/2022 02:05 PM
Project Title

SR 162/Spiketon Creek Bridge - Bridge Replacement

Physical Address View project details and contacts
City, State (County) Orting, WA 98360   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $3,360,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work, paving and new construction of a bridge / tunnel in Orting, Washington. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel. SR 162/Spiketon Creek Bridge - Bridge Replacement The existing bridge is structurally deficient. This project constructs a new bridge replacing the existing structurally deficient bridge, preserving the structural and functional integrity of this section of highway. Replace bridge 162/22. As of June 20, 2022, this project is in Conceptual status. Preliminary engineering has begun and environmental design is expected to be completed in the second quarter of 2024. The contract advertisement is expected in fourth quarter of 2025 and construction is anticipated to be operationally complete in the fourth quarter of 2026. WSDOT - SR 162/Spiketon Creek Bridge - Bridge Replacement *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents