Similar Projects
Asphalt Resurface and Bridge Replacement- US 20
New Construction, Infrastructure
Bidding
IN

IDIQ, Pavement Patching
Infrastructure
Bidding
Greencastle, IN 46135

2020 CCMG Resurfacing
Post-Bid
Windfall City, IN

2020 Resurfacing Drainage Improvements
Post-Bid
Sweetser, IN 46952

Asphalt Resurface
Results
IN

Asphalt Resurface and Small Structure Pipe Lining
Results
IN

2022 Wedging Program
Infrastructure
Bidding
Goshen, IN

2021-01 Road Paving - Eaton-Wheeling
Post-Bid
Muncie, IN 47302

Interchange Modification and Asphalt Resurface
Results
IN

VCSC 2021 Paving Repairs and Improvements
Post-Bid
Terre Haute, IN

Bituminous Resurface
Results
Vincennes, IN 47591

Albion Street Improvements
Post-Bid
Avilla, IN 46710

Asphalt Resurface
Results
IN

Brookston Street Paving
Post-Bid
$554,400 est. value
Brookston, IN

Asphalt Resurface, Intersection Improvement and Arch Rehab
Results

Reported 04/27/2022 12:00 AM
Project Title

Green River Road Trail Project

Physical Address View project details and contacts
City, State (County) Evansville, IN 47725   (Vanderburgh County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work for the Green River Road Trail Project includes the construction of a HMA multi-use pathway between Hightower Drive and Millersburg Road. Project elements include approximately 7,000 1ft of 8 ft wide multi-use pathway, the widening of one existing bridge, reconstruction ofthe Green River Road entrance to Goebal Soccer Park, modernization of an existing traffic signal, modular block wall, guardrail, storm sewerage, fire hydrant relocation, signing and pavement markings. The proposed work will also require clearing, removal and replacement of existing soils, chemical soil stabilization, erosion and sediment control and mulched seeding. Green River Road will be open to a minimum of one travel lane in each direction during construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents