Similar Projects
SHEP- Upper and Lower Dissolved Oxygen Water Wells, Pump and Distribution Systems
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Rincon, GA

Water Supply Wells 13 and 14
Term Contract
Bidding
$300,000 est. value
Sandersville, GA

Canton WTP Improvements Flocculator Replacement
Renovation
Bidding
$1,000,000 est. value
Canton, GA 30114

Warner Range Potable Water Well
Post-Bid
Columbus, GA 31901

Hightower Water Treatment Plant Expansion
Renovation
Post-Bid
Dawsonville, GA

Interstate Centre Wastewater Treatment Facility And Las Expansion
Results
Richmond Hill, GA

Aragon 170,000 Gpd Wastewater Treatment Belt Press And Building
Results
Less than $748,665 est. value
Cedartown, GA

Sanitary Sewer System Improvements
Infrastructure
Bidding
$400,000 est. value
Odum, GA

Shoal Creek Wastewater Treatment Plant Central
Post-Bid
Griffin, GA

Water Treatment Plant #1 Aerator Replacement
Results
Kingsland, GA 31548

I-85 1.0 MGD Water Reclamation Facility
New Construction
Bidding
$300,000 est. value
Jefferson, GA 30549

Pearl Street Well Replacement
Post-Bid
Shellman, GA

2020 Water System Improvements - Andrews Well 2
Results
Carnesville, GA 30521

Water Treatment Plant Clarifier Rehabilitation
Renovation
Bidding
$60,000 est. value
Cedartown, GA

Water Treatment Plant Expansion Membrane Procurement
New Construction
Post-Bid
GA

Last Updated 06/07/2022 04:47 AM
Project Title

Construction of Joiner Road Water Treatment Plant - New Treatment Facility Well No. 4

Physical Address View project details and contacts
City, State (County) Tennille, GA 31089   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the project titled Joiner Road Water Treatment Plant -New Treatment Facility Well No 4. The major components of construction include site demolition, site improvements, a new filtration system and housing structure, existing chemical building modifications, yard and connecting piping, a new vertical turbine backwash pump, chemical feed equipment, SCADA upgrade, electrical standby emergency generator and new electrical equipment.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents