Similar Projects
Water Meter Rehabilitation - Seneca Street Vault
Infrastructure
Design
$250,000 CJ est. value
Lewiston, NY 14092

Frontier House Redevelopment / Lewiston
Renovation, Infrastructure
Design
$5,000,000 CJ est. value
Lewiston, NY 14092

Porter on the Lake Park Improvements Phase 1
Infrastructure
Bidding
$250,000 CJ est. value
Porter, NY 14174

Beattie Avenue Phase 3 Waterline Replacements
Infrastructure
Bidding
$500,000 CJ est. value
Lockport, NY 14094

Streetlight L.E.D. Conversion
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Niagara Falls, NY 14301

People's Inc Apartment Renovations
Renovation, Demolition
Post-Bid
Buffalo, North Tonawanda, NY 14207

Village Municipal Building and Barker Pubic Library Basement Package
Infrastructure
Post-Bid
Barker, NY 14012

Development of Three Radio Sites in the Towns of Somerset, Wheatfield and Wilson
Alteration
Results
Barker, NY 14012

Lockport CSD - 2021 Site Repairs
Infrastructure
Results
Lockport, NY 14094

True Bethel Gardens
Renovation - 41,000 SF
Construction
$8,000,000 est. value
Niagara Falls, NY 14305

324 Niagara Apartments
Renovation
Construction
$2,000,000 est. value
Niagara Falls, NY 14303

Duncans Heating and Cooling Corporation Addition
Addition, Demolition, Infrastructure - 4,500 SF
Pending Verification
$300,000 CJ est. value
Niagara Falls, NY 14305

Lockport 4-Megawatt Road Solar Farm
New Construction, Infrastructure
Pending Verification
$9,760,000 CJ est. value
Wheatfield, NY 14132

Olcott Yacht Club Clubhouse Expansion
Addition, Demolition, Infrastructure - 3,000 SF
Design
$456,000 CJ est. value
Olcott, NY 14126

Sitework Repairs for the Lewiston-Porter Central School District
Infrastructure
Bidding
$80,000 CJ est. value
Youngstown, NY 14174

Last Updated 08/17/2022 01:10 PM
Project Title

East Goundry Street Apartment Building

Physical Address View project details and contacts
City, State (County) North Tonawanda, NY 14120   (Niagara County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 3 unit residential building. As of August 17, 2022, this project is seeking approval from the the North Tonawanda Zoning Board of Appeals. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments, 3 Unit(s).
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents