Similar Projects
Jordan Valley Water Treatment Plant (JVWTP) Blower Room Sound Abatement
Alteration
Bidding
$60,000 est. value
Riverton, UT 84065

Salt Lake Community College South City Campus Earthquake Plaster Repair
Alteration
Bidding
$50,000 est. value
Salt Lake City, UT 84115

3 Triad Center Ceiling Tile Replacement
Renovation
Post-Bid
Salt Lake City, UT 84103

Park Lane Elementary Gym Divider Replacement
Infrastructure
Post-Bid
Sandy, UT 84092

Secure Entry - Herriman High School
Results
Herriman, UT 84096

Secure Entry - Copper Hills High School
Results
West Jordan, UT 84081

9905--VA Signage Removal and Installation
Term Contract
Post-Bid
Salt Lake City, UT 84148

U Hospital Mediserve Renovo Dock Remodel - Metal Stud Framing
Results
Less than $64,238 est. value
Salt Lake City, UT 84113

U Of U Helix Signage Package
Term Contract
Post-Bid
Salt Lake City, UT

SLCC Linoleum Marmoleum Wainscotting
Results
Salt Lake City, UT

Midvale City Art House on Main Street Sink and Counter Installation
Alteration
Post-Bid
Midvale, UT 84047

DFCM Construction-Midvale DWS Building Flood Repairs
Alteration
Results
$500,000 est. value
Millcreek, UT 84107

Taylorsville Elementary School, Replace Ceiling Tiles
Alteration
Post-Bid
$100,000 est. value
Taylorsville, UT 84129

Arena Seating or Gym Floor Replacement Lifetime Activity Center
Alteration
Results
$160,000 est. value
Taylorsville, UT 84123

Moran Aesthetics Upgrade Millwork
Alteration
Results
$235,000 est. value
Salt Lake City, UT 84113

Last Updated 05/04/2022 05:28 AM
Project Title

Wall Construction

Physical Address View project details and contacts
City, State (County) Riverton, UT   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Wall is approximate 47' LF x 22' tall. Two sets of doors are to be furnished and installed; 1st doors - one double door, 30 x 30 x 96, solid core doors, one of the doors having a flush bolt on the top and bottom of the door, metal frame, City will provide the handle; second door - one man door 30 x 70 solid core door, metal frame. Wall is to be constructed using 6", 20 gauge metal studs. Wall is to be insulated with R-15 Batt, Provide two electrical outlets on each side of the wall, 5/8" sheet rock on both sides, one coat of primer, two coats of paint. To construct two walls in the City Civic Center and one wall in Public Works Facility. The City reserves the right to award each area to a different contractor or award to only one contractor based upon an overall low, whichever is in the best interest of the City.

Details

Division 09 - Finishes, Wall Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents