Similar Projects
Cedarburg CTH NN Const / Recon Intersection and Signals
Infrastructure
Conception
$1,000,000 CJ est. value
Cedarburg, WI 53012

Western Road Mixed Use
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Cedarburg, WI 53012

KMC Stampings Industrial Building Addition
Addition, Demolition, Infrastructure
Design
$1,000,000 CJ est. value
Port Washington, WI 53074

T. Cedarburg, Cedar Sauk Road, CTH Y - Northwoods Drive
Infrastructure
Bidding
$2,000,000 CJ est. value
Saukville, WI 53080

Hanover Avenue Street and Utility Extension
Infrastructure
Bidding
$400,000 CJ est. value
Cedarburg, WI 53012

102-120 West Freistadt Road Building Demolition
Demolition, Alteration
Post-Bid
$25,000 est. value
Mequon, Thiensville, WI 53097

Dorchester Drive Lift Station Rehabilitation
Renovation, Infrastructure
Post-Bid
$553,700 CJ est. value
Cedarburg, WI 53012

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

W62N186 Washington Multi-Tenant Building
New Construction, Infrastructure - 7,030 SF
Pending Verification
$2,000,000 CJ est. value
Cedarburg, WI 53012

Mequon Vet Clinic
New Construction, Infrastructure - 3,150 SF
Pending Verification
$1,900,000 CJ est. value
Mequon, WI 53097

Wisconsin Ave Townhomes
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Grafton, WI 53024

Ozaukee Country Club
New Construction, Infrastructure - 11,400 SF
Pending Verification
$2,200,000 CJ est. value
Mequon, WI 53092

Western Road Mixed Use
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Cedarburg, WI 53012

The Seasons at Grafton
New Construction, Infrastructure
Pending Verification
$105,616,000 CJ est. value
Grafton, WI 53024

Trinity Lutheran Church School Expansion
Addition, Demolition, Infrastructure
Design
$6,500,000 CJ est. value
Mequon, WI 53097

Last Updated 10/31/2022 01:32 PM
Project Title

Fermentorium Expansion / Cedarburg

Physical Address View project details and contacts
City, State (County) Cedarburg, WI 53012   (Ozaukee County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for expansion of a brewery. As of October 31, 2022, this project has not yet submitted any building permit applications for review. An architect has been selected. Information regarding the general contractor and method of selection has not been disclosed. Although a firm timeline cannot currently be established, construction is not expected to commence prior to first quarter 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

9,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents