Similar Projects
Broadford Park New Amphitheater
New Construction
Conception
Oakland, MD

Millersville Tennis Facility - Design, Construct, Manage, and Operate
New Construction
Design
Millersville, MD 21108

Beltway Plaza Redevelopment - Phase 1
New Construction
Design
Greenbelt, MD

Allegany High School - Field House
New Construction
Bidding
Cumberland, MD 21502

Creativity Center
New Construction, Build-Out - 6,500 SF
Post-Bid
Baltimore, MD 21224

Construct 2 Pavilions at Backbone Mountain/Mountain View Youth
New Construction
Post-Bid
Swanton, MD 21561

Band Stand Renovation - E. Eugene Myers Community Park
Results
Emmitsburg, MD 21727

Franklin High School Concession Stand and Emergency Access
Results
$500,000 to $1,000,000 est. value
Reisterstown, MD 21136

TopGolf
New Construction - 65,000 SF
Construction
Baltimore, MD 21230

The Compass
New Construction
Pending Verification
Baltimore, MD 21201

Moss Pavilion
New Construction
Pending Verification
Accokeek, MD 20607

Frederick Douglass Park Construction
New Construction - 25,000 SF
Design
$37,500,000 est. value
Easton, MD

Construct Pavilion and Replace Boardwalk Decking at Alfred D. Noyes Children`S Center
New Construction, Infrastructure
Post-Bid
Rockville, MD 20850

Pavilion Replacement at Potomac Garrett State Forest
New Construction
Results
$100,000 to $500,000 est. value
Oakland, MD 21550

Youth Arts Center
Build-Out
Pending Verification
$7,000,000 est. value
MD

Last Updated 03/17/2022 08:15 AM
Project Title

Emily Bayless Graham Corn Crib and Hay Barn Stabilization and Weatherization

Physical Address View project details and contacts
City, State (County) Bel Air, MD 21015   (Harford County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all materials and labor, equipment, tools and other facilities and services, as required for the construction of the improvements. The improvements to be performed at the corn crib include removing and replacing the slate roof, replacing the existing window, replacing missing/rotted wood siding, joists, corner posts, and doors, painting exterior, demo of lean-to, as well as replacing the foundation and rebuilding the stairs. Improvements at the hay barn include replacing the metal roof, replacing missing/rotted wood siding, rebuilding two barn doors, and painting the exterior.

Details

Misc. Recreational, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents