Similar Projects
Reported | 12/10/2021 12:00 AM |
Project Title | Central Utilities Chilled Water System Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Birmingham, AL 35233 (Jefferson County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $900,000 to $1,200,000 |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project is primarily a maintenance pump replacement project. The existing chilled water secondary pumps in Central Plant #1 are beyond their service life and shall be replaced. The work shall involve, but not be limited to, replacement of four chilled water pumps along with the pump’s associated isolation valve, flow control valve, check valve, suction diffuser and hydronic specialties. Additionally, one existing pump, shall be reworked with new internals and a new motor. Electrical work shall include installation of variable speed drives, and reworking the power feeds to all the pumps. Controls work shall include installation of new PLC devices along with reworking existing PLC devices. Along with installation, programming of the controls devices shall be required. Work will be performed in an operating chilled water plant. All work shall be coordinated with UAB Central Plant Operations and UAB Project Management. Pump systems shall be replaced one at a time so that the new pump is operational prior to working on the next pump system. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |