Similar Projects
East Genesee Street Commercial Development
New Construction, Infrastructure - 100,000 SF
Conception
$20,000,000 CJ est. value
Fayetteville, NY 13066

RFP Design - Design Consulting Services for Onondaga Creek Restoration
Infrastructure
Conception
$250,000 CJ est. value
Syracuse, NY 13202

Construction Management Services
Renovation, Infrastructure
Design
$72,184,922 CJ est. value
Syracuse, NY 13207

Marcellus Park Pump Station Improvement Program
Renovation
Design
$1,000,000 CJ est. value
Marcellus, NY 13108

Replacement of the Warners Road Bridge over I-90
Infrastructure
Bidding
$2,000,000 CJ est. value
Liverpool, NY 13088

Playground Installation
Infrastructure
Bidding
$420,207 CJ est. value
Syracuse, NY 13202

Multi-Tenant Shell Development / Cicero
New Construction, Infrastructure - 8,037 SF
Post-Bid
$2,000,000 CJ est. value
Cicero, NY 13039

RFQ D/B - I-81 Viaduct Project - Phase 1, Contract 2
Demolition, New Construction, Infrastructure
Post-Bid
$3,750,000 CJ est. value
Syracuse, NY 13210

Replacement of Interchange 35 Bridge Over I-90
Infrastructure
Results
$8,178,718 CJ est. value
Albany, NY 12205

Hutchings Psychiatric Center - Phase I Overall Site Improvements
Infrastructure
Results
$4,116,745 CJ est. value
Syracuse, NY 13210

I-481 and S.R. Industrial Sewer Corridor Project
New Construction
Construction
DeWitt, NY 13057

Fietta Property Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Manlius, NY 13057

Bowman Road East Solar Array
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
East Syracuse, NY 13057

RFP Engineering - Design of the Brighton Avenue Booster Pump Station Replacement Project
Demolition, New Construction, Infrastructure
Conception
$400,000 CJ est. value
Syracuse, NY 13210

US Route 11 over Tioughnioga River Bridge Project
Demolition, New Construction, Infrastructure
Design
$20,500,000 CJ est. value
Tully, NY 13159

Last Updated 10/06/2022 12:33 AM
Project Title

Furnish Davis Road Pump Station Rehabilitation as Specified

Physical Address View project details and contacts
City, State (County) Clay, NY 13212   (Onondaga County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $13,023,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish Davis Road Pump Station Rehabilitation as Specified' Participation Requirements - Minority Business Participation - Women-Owned Business Participation - Bid Bond 5 % Questions are submitted online No Question Acceptance Deadline 03/31/2022 04:00 PM EDT The project consists of furnishing complete and installation of improvementsto the rehabilitation of the Davis Road Pump Station. Generally, the project consists of replacement of two (2) influent pumps, valving and piping, replacement mechanical bar screen, replacement slide gates, upgrades to the bulk sodium hypochlorite storage and dosing system, new 30-inch HDPE force main, installation of standby generator and load bank, PLC-base control panels and instrumentation replacements, electrical improvements, heating and ventilation and plumbing system upgrades and improvements along with other miscellaneous asset replacements. All contract work is required to be complete within 450 calendar days of the written Notice To Proceed. Custom BT Result MA BONGIOVANN GENERAL 9,220,000 PATRICIA ELECTRIC ELECTRIC 3,441,000 ADVANCE SHEET METAL HVAC 362,000

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents