Similar Projects
69th Street Wastewater Treatment Plant - R-000509 - City of Houston
Renovation
Conception
$32,740,000 est. value
Houston, TX 77011

Highway 80/Davis Lane 18" Wastewater Rehabilitation - 669 - City of San Marcos
Renovation
Conception
$3,550,000 est. value
San Marcos, TX 78666

New Multi-Use Solid Waste Department Facility
New Construction
Design
Houston, TX 77026

Wilbarger Creek Wastewater Treatment Facility
New Construction
Design
Pflugerville, TX

Flintrock Effluent Improvements Phase I
Demolition, New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
Lakeway, TX 78734

RFP Construction Manager At-Risk Services - Backup Power Generators and Diesel Fuel Storage and Dispensing Systems
Infrastructure
Bidding
$100,000 CJ est. value
El Paso, TX 79901

WWTP Improvements TWDB
Post-Bid
Huntington, TX

Centrifuge Control Panel Replacement at Robinson Creek WWTP
Post-Bid
Huntsville, TX

Ulitmate Wastewater Treatment Plant Phase 3 Expansion - 0.72 MGD - Construction
Results
$2,100,000 est. value
Houston, TX 77056

North Waste Water Treatment Plant Headworks Replacement Project
Results
Austin, TX

Wastewater Plant Phase One
New Construction
Construction
TX

Northwest Sludge Processing Facility
New Construction
Pending Verification
Copperas Cove, TX 76522

South Wastewater Treatment Plant Office/Lab Construction
New Construction
Pending Verification
Copperas Cove, TX 76522

Hornsby Bend BioSolids Management Plant Headworks Improvements - 3164.075 - City of Austin
Renovation
Conception
$3,365,000 CJ est. value
Austin, TX 78725

TBWWTP Expansion, Phase II
Addition
Design
$28,820,000 est. value
Temple, TX 76502

Last Updated 10/14/2022 08:02 AM
Project Title

BAWA East Surface Water Plant Phase 2 Expansion - BAWA2401 - City of Baytown

Physical Address View project details and contacts
City, State (County) Mont Belvieu, TX 77523   (Chambers County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $55,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction and design of a six (6) million gallons per day (MGD) expansion of the existing surface water treatment plant south of Interstate Highway (IH) 10 and west of SH 99 along the Coastal Water Authority (CWA) Barbers Hill Canal. The design will provide for the ability to expand the plant based on future water demands and allow the plant to convert to salt water treatment (desalinization) ensuring long term viability. This project is in included in the City's or County's FY 2023-2027 Capital Improvement Plan (CIP). As of October 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents