Similar Projects
Vault Toilet Pumping Service
Term Contract
Post-Bid
Boise, ID 83702

Spring Valley Wastewater Treatment Plant Phase 1
New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Eagle, ID 83616

High Density Polyethylene Pipe (HDPE) Lining
Term Contract
Sub-Bidding
Boise, ID 83702

exp - Holt Arena President's Deck Mechanical and Plumbing
Alteration
Post-Bid
$200,000 est. value
Pocatello, ID

Wastewater Treatment Plant Dewatering Project
New Construction, Renovation, Infrastructure
Bidding
$9,500,000 CJ est. value
Idaho Falls, ID 83402

2022, East Ustick Road Trunk Line, Dixie Drain to Florida Avenue
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Caldwell, ID 83605

NWB Shoshone Outbuildings - 50% CD
Alteration
Post-Bid
Preston, ID

Replace Sink
Alteration
Post-Bid
ID

Last Updated 12/22/2022 01:44 AM
Project Title

FY22 Capital Maintenance, Phase 1, Boise

Physical Address View project details and contacts
City, State (County) Boise, ID 83702   (Ada County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Key Number : 19465 Scope : For the work to rehabilitate the existing roadway sections, upgrade existing pedestrian ramp facilities, replace CMP pipe, update the 9th Street traffic signal and install a PHB on Maple Grove Road. Work of Pavement Rehabilitation on Various Arterial and Collector Road Segments in the Boise Area. Work Includes Asphalt and Concrete Paving, Concrete Sidewalks and Pedestrian Ramps, Pipe Replacement, a New Pedestrian Hybrid and Traffic Signal Modification. Additional Information Contact: Resident Engineer Dale Kuperus (Achd) Contact Kadee Porter (Achd) at (208) 387-6290 for Any Design Related Questions. In an Effort to Achieve Itd's Dbe Annual Participation Goal (Apg) of 10.0% Utilization, For This Project, It Has Been Determined That There is a Dbe Availability Of 15% or More. This Contract Requires Full Compliance With Title Vi of the Civil Rights Act of 1964, Which Protects Persons From Being Denied the Benefits of or Excluded From Participation in Programs or Activities; or Subjected to Discrimination Based on Race, Color, National Origin, Sex, Age, Disability, Limited English Proficiency or Economic Status. The Contractor is Encouraged to Utilize the Goods and Services of Disadvantaged Firms in Accomplishing the Tasks or Providing the Services of This Agreement, and to Provide Equal Opportunity to All Sub-bidders and Suppliers. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents