Similar Projects
Ac Water Group 1027A - City Of San Diego
Alteration
Conception
$900,000 est. value
San Diego, CA 92101

Helix 9 Flow Control Facility
New Construction, Infrastructure
Design
$6,000,000 to $8,000,000 est. value
San Diego, CA

Upgrade Domestic Hot and Cold Water Systems
Term Contract
Bidding
$5,000,000 to $10,000,000 est. value
San Diego, CA 92161

Gordon Hill Road Pipeline Replacement Project
Infrastructure
Bidding
$2,600,000 est. value
Valley Center, CA 92082

Design of Otay 2nd Pipeline St Replacement Ph 5
Infrastructure
Post-Bid
$200,000 to $2,500,000 est. value
San Diego, CA 92101

Chilled Water System
Infrastructure
Post-Bid
San Diego, CA

Recycled Air/Vac & Drain Replacement Project
Alteration
Results
$50,000 est. value
Fallbrook, CA 92028

City of Poway Treated Water Facilities and Redundant Pipeline Project
Infrastructure
Results
$1,310,000 est. value
Poway, CA 92064

MLK Recreation Center Moisture Intrusion
Infrastructure, Alteration
Bidding
$916,000 est. value
San Diego, CA 92114

Construction Management for Alvarado 2nd Pipeline
Term Contract
Post-Bid
$300,000 to $350,000 est. value
San Diego, CA

SDIA - Airport Administration Building - Underground Utilities
Infrastructure
Results
San Diego, CA 92108

Palomar Airport Waterline Realignment
Infrastructure
Bidding
$1,640,000 est. value
Carlsbad, CA 92008

Job Order Contract (Joc) Pipeline
Infrastructure
Post-Bid
$40,000,000 est. value
San Diego, CA

AC Water & Sewer Group 1052
Infrastructure
Results
$14,610,000 est. value
San Diego, CA 92101

Downtown and Terramar Water Main Replacement
Infrastructure
Bidding
$3,220,000 est. value
Carlsbad, CA

Reported 07/09/2022 12:00 AM
Project Title

Electrical Motors Overhaul Services

Physical Address View project details and contacts
City, State (County) San Diego, CA 92106   (San Diego County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This is a service / maintenance or supply contract in San Diego, California. Contact the soliciting agency for additional information. The Public Utilities Department, Wastewater Treatment and Disposal Division (WWTD) needs motors overhauled to like new conditions. The motors are located at Point Loma Wastewater Treatment Plant (PLWTP), Pump Station 1 (PS1), Pump Station 2 (PS2), North City Water Reclamation Plant (NCWRP), and South Bay Water Reclamation Plant (SBWRP). This Invitation to Bid (ITB) has two distinct scopes of work defined by facility location. Preferences ELBE - Emerging Local Business Enterprise SLBE - Small Local Business Enterprise Project Type Bid Response Types Line Items Response File General Attachment General Attachment General Attachment General Attachment Type of Award Lump Sum Project Duration 5 Years Online Q&A Yes Q&A Deadline 05/20/2022 12:00 PM (PDT)

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents