Similar Projects
Construction of Water and Paving Facilities for Bridge Creek Terrace Drive 2
Infrastructure
Bidding
Cypress, TX 77433

Elyson, Section Thirty Seven Water, Sanitary Sewer, Storm Sewer Facilities, and Reinforced Concrete Paving
Post-Bid
TX

Pipe, PVC, Schedule 80 Various Sizes
Post-Bid
Houston, TX

Waterline to Serve Lift Station No. 3 and Spring ISD
Results
TX

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

East River Phase I
New Construction - 649,156 SF
Construction
Houston, TX 77020

HEB Houston 59 #656 Curbside
Renovation, Addition - 5,879 SF
Construction
$250,000 est. value
Cypress, TX 77433

(H69) 22053 / O'Reilly Auto Parts
New Construction, Infrastructure - 7,453 SF
Pending Verification
$1,000,000 CJ est. value
Houston, TX 77032

Imperial Forest Section 5
Post-Bid
Houston, TX

Silver Springs West Richey Road Dedication, Section One
Results
Less than $1,009,711 est. value
Houston, TX 77040

Almeda & Orem RV Resort
New Construction - 4,448 SF
Construction
$3,700,000 est. value
Houston, TX 77045

Northwest Waterline Rehabilitation Phase 1 of 4
Alteration
Post-Bid
Jacinto City, TX

SWSP - Segment C
Results
$121,900,000 est. value
Houston, TX 77002

Clearing and Grubbing for Black Oak Phase 2
Infrastructure
Post-Bid

SWSP - Segment B3
Results
Houston, TX 77002

Last Updated 07/22/2022 08:05 AM
Project Title

HPW - FY2023 Local Drainage Program (LDP) Contract 2

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Rehab of City of Houston storm sewers, outfalls, roadside and off-road ditches.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents