Similar Projects
Rehabilitation Taxiway B North - City of Billings
Infrastructure
Conception
$1,320,000 CJ est. value
Billings, MT 59105

Rehabilitation Taxiway B North - City of Billings
Infrastructure
Conception
$1,320,000 CJ est. value
Billings, MT 59105

Y--GAOA - EMDD Fog Seal
Term Contract
Design
$100,000 to $250,000 est. value
Billings, MT 59101

Cargo Ramp - Slot 5 Expansion - City of Billings
Renovation, Infrastructure
Design
$5,890,000 CJ est. value
Billings, MT 59105

Landfill Gas Compliance Flare Procurement
Infrastructure
Bidding
$195,000 CJ est. value
Billings, MT 59101

Billings Operations Center BOC Concrete Aprons, Phase 5
Infrastructure, Renovation
Bidding
$300,000 CJ est. value
Billings, MT 59101

Pistol Range, Parking & Road Improvements
Alteration
Post-Bid
Billings, MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Reconstruct Existing Two-Way Stop-Controlled Intersection
Infrastructure
Results
Billings, MT 59106

24th Street West Central Avenue Signal, Turn Lane, and Pedestrian Improvements
Infrastructure
Results
Billings, MT 59102

Shop World 3 Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Billings, MT 59106

Falcon Ridge 4 Plex
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Billings, MT 59106

Public Ramp - Northside Expansion - Phase 2 - City of Billings
Demolition, Infrastructure
Conception
$1,750,000 CJ est. value
Billings, MT 59105

Lead Service Replacements
Infrastructure
Design
$600,000 CJ est. value
Billings, MT 59101

Panda Express - King Ave / Billings
New Construction, Infrastructure - 2,621 SF
Bidding
$1,500,000 CJ est. value
Billings, MT 59102

Last Updated 03/17/2023 03:06 PM
Project Title

Brewington Drive Reconstruction

Physical Address View project details and contacts
City, State (County) Billings, MT 59105   (Yellowstone County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,313,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

W.O. 22-21: This project reconstructs the following streets in the Billings Heights: Brewington Drive (between Kyhl Lane and Wicks Lane), Erb Circle (cul-de-sac), Lynch Circle (cul-de-sac), and Dayton Circle (cul-de-sac). The reconstruction includes removal and replacement of asphalt concrete pavement and portions of existing concrete driveways, the installation of new concrete curb and gutter, boulevard sidewalks and accessible ramps, concrete drive approaches and driveways, new storm sewer infrastructure, landscaping, street signs, and other miscellaneous construction. CONTRACTOR and any of the CONTRACTOR'S subcontractors bidding or doing work on this project will be required to be registered with the Montana Department of Labor and Industry (DLI). Forms for registration are available from the Department of Labor and Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling 1-406-444-7734. All laborers and mechanics employed by CONTRACTOR or subcontractors in performance of the construction work shall be paid wages at rates as may be required by the laws of Yellowstone County and the state of Montana. The CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the "City of Billings, MT" in an amount not less than ten percent (10%) of the total amount of the bid. Successful BIDDERS shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. Bids submitted via email shall have the bid bond scanned and included with the bid. Bids submitted via mail or hand delivered shall have any of the bid securities included.For further information concerning this project, please contact JD Anderson at the Office of the City Engineer, 2224 Montana Ave., Billings, MT 59101, by telephone at (406) 237-6178 or by email at andersonj@billingsmt.gov. The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period of not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the best interest of the OWNER. 26215055

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents