Similar Projects
Last Updated | 05/03/2023 03:02 PM |
Project Title | SR 29 over Pikes Creek |
Physical Address | View project details and contacts |
City, State (County) | Hunlock Township, PA 18621 (Luzerne County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of May 3, 2023, the project has been awarded. A timeline for construction has not been confirmed. For the preservation of a bridge in LUZERNE COUNTY, LEHMAN TOWNSHIP, COMMONWEALTH OF PENNSYLVANIA, STATE ROUTE 0029, SECTION D57. The project being situated as follows: From a point on SR 0029 at Segment 0290 Offset 1045 (Station 496+30.00) to a point approximately 800.00 feet (0.152 miles) along SR 0029 at Segment 0300 Offset 0027 (Station 506+30.00). This project involves preservation to the existing Reinforced Concrete Slab Bridge carrying SR 29 over Pikes Creek, in Lehman Township, Luzerne County. Construction will be staged utilizing a two-way one-lane traffic control pattern and temporary traffic signal, with nearby driveways and intersections to be signalized. Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 29.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: BRIDGE REPLACEMENT 408 Version: 2020-6 PennDOT - SR 29 over Pikes Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |