Similar Projects
Lee's Landing
New Construction - 201,156 SF
Conception
West Palm Beach, FL 33413

Certus Memory Care Facility
New Construction - 43,400 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Boynton Beach, FL 33437

The Oaks at Palm Springs
New Construction - 47,547 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Palm Springs, FL 33406

Villages of Windsor
New Construction - 296,000 SF
Design
$10,000,000 CJ est. value
Boynton Beach, FL 33460

375 Royal Palm
New Construction - 207,051 SF
Post-Bid
$10,000,000 CJ est. value
Boca Raton, FL 33432

Green Cay Village Senior Housing
New Construction - 440,660 SF
Post-Bid
$150,000,000 est. value
Boynton Beach, FL 33437

Sunspire Health Congregate Living
Renovation - 32,800 SF
Construction
$75,000 est. value
Palm Beach Gardens, FL 33403

Abbey Delray
Addition - 110,000 SF
Construction
$36,000,000 est. value
Delray Beach, FL 33445

One Juno Development
New Construction - 8,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Juno Beach, FL 33408

Discovery Village West Palm Beach
New Construction - 322,782 SF
Design
$38,221,779 est. value
West Palm Beach, FL 33411

Orchid Trail Senior Living at Boynton Commons
New Construction - 130,000 SF
Post-Bid
$20,000,000 to $25,000,000 est. value
Boynton Beach, FL 33436

Georgian Gardens
New Construction - 60,000 SF
Construction
$6,704,998 est. value
West Palm Beach, FL 33409

Holden of Delray Beach
New Construction - 218,279 SF
Design
$10,000,000 CJ est. value
Delray Beach, FL 33446

Hibiscus Palace
Renovation - 5,805 SF
Post-Bid
Wellington, FL 33414

The Wellery Senior Living Community
New Construction - 116,154 SF
Construction
$23,813,417 est. value
Delray Beach, FL 33484

Last Updated 03/19/2020 07:49 AM
Project Title

Toby & Leon Cooperman Sinai Residences Boca Raton - Phase II

Physical Address View project details and contacts
City, State (County) Boca Raton, FL 33428   (Palm Beach County)
Category(s) Medical, Residential
Sub-Category(s) Assisted Living Facility, Nursing/Rehabilitation Center
Contracting Method
Project Status Construction Commenced March 2020, Construction Completion Expected fourth quarter 2022
Bids Due View project details and contacts
Estimated Value $160,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

276,824 SF - 1 Assisted Living Facility, 4 Stories Above Grade, 251,824 SF New Construction 202 Unit(s), 1 Nursing/Rehabilitation Center, 2 Stories Above Grade, 25,000 SF New Construction, 40.20 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Wall Coverings, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents