Similar Projects
Lucky Star Wind Farm
New Construction, Infrastructure
Conception
$650,000,000 CJ est. value
Medicine Bow, WY 82329

Groundwater Ultraviolet Disinfection Facility - 09-RWS-19 - City of Casper
New Construction, Infrastructure
Conception
$12,000,000 CJ est. value
Casper, WY 82601

FY23 Public Works Facility Garage Addition
Addition, Demolition, Infrastructure
Design
$420,000 CJ est. value
Torrington, WY 82240

Lower Valley Energy Workforce Housing
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Jackson, WY 83001

Wolf Creek Road Reconstruction Project
Infrastructure
Bidding
$240,000 CJ est. value
Ranchester, WY 82839

Wigwam Rearing Station - Fiberglass Tank Removal/Octaform Tank Installation
Infrastructure
Bidding
$300,000 CJ est. value
Ten Sleep, WY 82442

Cheyenne Cemeteries Irrigation System Replacement
Infrastructure
Sub-Bidding
$3,090,372 CJ est. value
Cheyenne, WY 82001

Tunnel #2 Cave-in Restoration
Alteration
Post-Bid
Torrington, WY

Owner`s Representative for the Horizontal Infrastructure and Site Planning and Development
Infrastructure
Post-Bid
Jackson, WY 83001

District 3 Stockpiles
Infrastructure
Results

District 3 Stockpiles
Infrastructure
Results

Storey Boulevard and Ridge Road Signalized Intersection
Infrastructure
Construction
$480,000 CJ est. value
Cheyenne, WY 82001

Natrona County School District Tennis Complex - Early Bid Packages
New Construction, Infrastructure
Construction
$1,000,000 CJ est. value
Casper, WY 82601

U-Haul of Gillette
New Construction, Infrastructure - 38,264 SF
Pending Verification
$4,000,000 CJ est. value
Gillette, WY 82718

Hyatt Place Hotel and Cheyenne Center
New Construction, Infrastructure - 70,000 SF
Pending Verification
$55,000,000 CJ est. value
Cheyenne, WY 82007

Last Updated 12/08/2022 06:19 AM
Project Title

Water Tank Overflow Pipe Installation Orin Junction Rest Area

Physical Address View project details and contacts
City, State (County) Douglas, WY 82633   (Converse County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $670,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

WYDOT - Water Tank Overflow Pipe Installation - Orin Junction Rest Area Permit Number: 2022-328 PWS# WY5601197NC Questions concerning this Invitation to Bid should be posted to Public Purchase.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents