Similar Projects
Cottage Demolition and Restoration
Renovation
Bidding
Less than $700,000 est. value
King, WI

Flag Hill Park – New Restroom and Parking Lot
New Construction
Bidding
Chippewa Falls, WI

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Liberty Park Shelter and Bathroom
Results
Less than $315,000 est. value
Sun Prairie, WI 53590

2822 Milwaukee Street Demolition
Demolition
Results
Madison, WI 53704

Apostle Islands Area Campground Expansion
New Construction
Pending Verification
Bayfield, Red Cliff, WI

Memorial Park Pavilion & Restroom Improvements
New Construction
Bidding
Lancaster, WI 53813

Raze and Removal at 3015 Washington Avenue
Post-Bid
Racine, WI 53405

2020 Sanitary Sewer Rehabilitation at Multiple Locations - Sewer Manholes and Pipe Rehabilitation
Results
Milwaukee, WI

Digester Cover Rehabilitation Project
Renovation
Bidding
Waupaca, WI

Water Treatment Services
Term Contract
Post-Bid
Black River Falls, WI 54615

Maurer Hall Roof Replacement
Results
Less than $1,018,440 est. value
Union Grove, WI 53182

Asbestos Abatement and Removal of Remaining Hazardous Materials and Restricted Wastes
Post-Bid
Chilton, WI 53014

Remodeling and Repairs at 8711 W Rohr Avenue
Renovation
Post-Bid
Milwaukee, WI 53225

Last Updated 03/08/2021 08:39 AM
Project Title

City Park Toilet Expansion

Physical Address View project details and contacts
City, State (County) Reedsburg, WI 53959   (Sauk County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing toilet facility will be expanded to include more fixtures for each gender as well as an accessible family toilet room. Work includes demolition of existing fixtures, masonry walls, and roof structure followed by the construction of new walls, installation of new fixtures and construction of a complete new roof structure. The existing facility is 460 sf and the addition area is 538 sf for a total project area of 998 sf.The existing facility is a single wythe, split-faced masonry building with wood framed truss roof. Existing foundations are concrete frost wall. New foundations will match existing. Interior walls and privacy partitions are painted masonry. New construction will match existing for materials and masonry finishes. The facility is designed for passive ventilation and is unheated. Plumbing and electrical systems will be delivered as design / build services provided through the General Contractor.

Details

Restroom/Bath House, Approximately 538 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents