Similar Projects
The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

New Intracoastal Waterway Bridge - City of Orange Beach
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Orange Beach, AL 36542

SR 59 Capacity Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Gulf Shores, AL 36542

SR 59 Capacity Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Gulf Shores, AL 36542

Effluent Outfall Upgrades USDA Rural Development
Post-Bid
Loxley, AL 36551

2021 Resurfacing Project
Post-Bid
Bay Minette, Daphne, Robertsdale, Spanish Fort, AL 36527

County Road 7 Roadway Failure Repair
Results
$559,865 est. value
Birmingham, Oneonta, AL 35244

2021 Roadway Resurfacing
Results
$429,000 est. value
Orange Beach, AL

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Aldi / Daphne
New Construction, Infrastructure
Pending Verification
$3,500,000 CJ est. value
Daphne, AL 36526

Live Oak Estates
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Fairhope, AL 36532

Smith Intermediate School Addition & Renovation - 2021 Bond - Cleburne Independent School
Addition, Infrastructure, Renovation
Design
$5,871,648 CJ est. value
Eufaula, AL 36027

Stanley Jensen Stadium Improvements
Infrastructure, Renovation - 20,000 SF
Bidding
$12,820,000 CJ est. value
Prattville, AL 36067

2021 Resurfacing Project Group B
Post-Bid
Elberta, Loxley, Robertsdale, AL 36551

Last Updated 09/23/2022 05:09 AM
Project Title

Intersection Improvements (Grading, Drainage, and Pavement) on SR-8 (US-80)

Physical Address View project details and contacts
City, State (County) Livingston, AL 35470   (Sumter County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $3,970,924 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Sumter Constructing the Intersection Improvements (Grading, Drainage, and Pavement) on SR-8 (US-80) at the junction of SR-28 and the junction of CR-25 southeast of Livingston. Length 0.445 mi. The Bracket Estimate on this project is from $2,984,214 to $3,647,373 . Contract Time: 90 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 004 - Intersection Improvements (Grading, Drainage, and Pavement) on SR-8 (US-80) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents