Similar Projects
C1DA--VISN 21 Master Planning/Study A/E IDIQ
New Construction, Term Contract
Design
$50,000,000 to $100,000,000 est. value

Cultural and Environmental MATOC
Term Contract
Bidding

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Engineering, Planning and Development
Post-Bid

Indefinite Delivery/Indefinite Quantity Contract for Architect-Engineer Services for Geotechnical Engineering Services at Various Government Installations Primarily In The NAVFAC-South
Term Contract
Post-Bid
$2,000 to $15,000,000 est. value

IDC A-E Services for Horizontal Design Needs Primarily for Department of Homeland Security Nationwide
New Construction, Renovation
Results
Less than $65,000,000 est. value

Oak Grove Road Pavement Rehabilitation Phase 3 Civil Engineering Design Services
Alteration
Results
Concord, CA 94518

C1da--Visn 21 Design A/E IDIQ 2022-2027
New Construction
Bidding

Diablo Creek Maintenance Building Fire Repair
Alteration
Post-Bid
$300,000 est. value
Concord, CA 94520

Citywide Protected Left-Turn Phasing Project
Infrastructure
Results
Concord, CA

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

Comprehensive Long-Term Environmental Action Navy (C.L.E.A.N.) Contract For Architect-Engineer (A-E) Services
New Construction, Term Contract
Post-Bid
Less than $100,000,000 est. value

Haystack Channel Improvements
Infrastructure
Results

Ellis Lake Area Sanitary Sewer Improvements
Infrastructure
Bidding
$5,120,000 est. value
Concord, CA

Whitman Road Sanitary Sewer Improvements
Infrastructure
Post-Bid
Concord, CA 94520

Last Updated 01/21/2022 05:57 PM
Project Title

Citywide Traffic System Upgrade Phase 2

Physical Address View project details and contacts
City, State (County) Concord, CA   (Contra Costa County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project is to upgrade the traffic signal hardware and equipment at 45 intersections Citywide and add a Lead Pedestrian Interval for 43 of the 45 intersections. ADA compliant curb ramps will be constructed on an as-needed basis.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents