Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Intersect Modif
Infrastructure
Design
$8,000,000 CJ est. value
El Reno, OK 73036

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

137th Backflow Repair
Term Contract
Post-Bid
Oklahoma City, OK

Waterline Replacement - Memorial Road and Lake Hefner Parkway
Infrastructure
Results
$875,000 est. value
Oklahoma City, OK

OKC Zoo Water Line Extension
Infrastructure
Results
$500,000 est. value
Oklahoma City, OK

NW 10th @ The Stack
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Yukon, OK 73099

Brookstone Village
New Construction, Infrastructure - 20,000 SF
Pending Verification
$5,300,000 CJ est. value
Oklahoma City, OK 73064

Flour Mill & Coop Mill Redevelopment / Yukon Technology Center
Demolition, New Construction, Infrastructure, Renovation - 476,920 SF
Design
$120,000,000 CJ est. value
Yukon, OK 73099

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Waterline Replacement
Infrastructure
Results
$2,216,905 est. value
Oklahoma City, OK

Eagles Glen
New Construction, Infrastructure
Pending Verification
$12,910,000 CJ est. value
Oklahoma City, OK 73099

Grade, Drain and Surface - SH 4
Infrastructure
Design
$12,360,000 CJ est. value
Yukon, OK 73099

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Water System Improvements
Infrastructure
Results
$232,000 to $237,000 est. value
El Reno, OK 73036

Last Updated 04/12/2023 11:03 PM
Project Title

152 Sewer Relocation

Physical Address View project details and contacts
City, State (County) Mustang, OK 73064   (Canadian County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $910,950 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sanitary Sewer (Gravity), Sewer Pump Station, Sewer Force Main, Sewer and Water Construction, Directional Bore, Electrical and Controls, Fencing/Guardrails/Handrails Construction of a 150 GPM lift station, 34 LF of 4" PVC force main, 431 LF of 8" PVC gravity sewer, 4 manholes, and all necessary fitting and appurtenances. Contact Michael Taylor with any questions. This project consists of furnishing all required materials, supplies, equipment, tools, and plan to perform all necessary labor for the construction of S.H. 152 Sewer Relocation. The work shall be done in accordance with plans and specifications on file in the City Manager's Office. Plans, specifications, and other bidding documents are available for public inspection and copies may be obtained by visiting the respective Engineer, Cowan Group Engineering, LLC, 7100 N Classen Blvd, Suite 500, Oklahoma City, Oklahoma 73116. There will be a non-refundable charge for bidding documents and plans All blank spaces for bid prices must be completed, in ink or typewritten, and in both words and figures. Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his/her address, and the name of the project for which the bid is submitted. If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in the bid form. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for opening the bids, as well as bids received after the time set for receipt of bids, WILL NOT be considered and will be RETURNED UNOPENED. Liquidated damages shall be paid by the Contractor at the rate of $500.00 per each and every calendar day required by him to complete the contract in excess of the contract time. The following description, while not intended to cover all details, outlines some items of the work to be accomplished under this Contract: 1. Construction of one (1) Lift Station and valve vault 2. Construction of 4" Force Main 3. Construction of 8" Gravity Sewer Line INTERPRETATION OF CONTRACT DOCUMENTS Questions regarding documents, discrepancies, omissions, or intent of the specifications or drawings shall be submitted in writing to the Owner through the Engineer at least seven (7) days prior to opening of bids to provide time for issuing and forwarding an addendum. Any interpretation of the contract documents will be made only by addendum duly issued or delivered by the Owner to each person receiving a set of documents. The Owner will not be responsible for any other explanations or interpretation of the contract documents.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents