Similar Projects
Miscellaneous Construction Contract (Mcc)
Renovation, Alteration
Bidding
$47,568 est. value
Miami, FL 33136

Town Hall HVAC Replacement
Alteration
Bidding
Miami Lakes, FL 33014

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
Less than $14,796 est. value
Miami, FL 33169

HVAC Chillers/Equipment and Water Treatment Services
Post-Bid
FL

Replace Chillers and Air Handlers, Multi-Facilities
Results
$500,000 to $1,000,000 est. value
Homestead, FL 33039

J041--Chiller 1 and 3 VSD Replacement
Results
Miami, FL 33125

Miscellaneous Construction Contract
Alteration
Bidding
$23,338 est. value
Miami, FL 33136

HVAC and Mechanical Products
Term Contract
Post-Bid

J045--Services: CLC Re-Heat Replacement, Miami VA
Results
Miami, FL 33125

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Chiller Plant Services
Term Contract
Results
Miami, FL 33199

Homestead, ARB, FL HVAC IDIQ Sources Sought
Post-Bid
Homestead, FL

HVAC and Controls: Replace, Supply and/or Install
Results
Miami, FL

Chillers and Water Treatment Services
Post-Bid
FL

A/C Replacements at La Esperanza (Townhouses)
Results
Hialeah, FL

Last Updated 12/10/2021 03:57 PM
Project Title

JL King Ductwork Cleaning Project

Physical Address View project details and contacts
City, State (County) Miami, FL 33132   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, equipment and materials necessary to remove and replace all these equipment with the new equipment and to remove the dirt, debris, and particles that have accumulated in the outside air chase/ductwork, air handler units, ductwork, turning vanes, splitters, dampers, all surfaces within the associated duct work, supply diffusers, and return grilles. All foreign materials such as dust, mold, soot, lint, hair, bacteria, and other air movement residues shall be removed from the area

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents