Similar Projects
Heating System Maintenance for Six (6) Developments
Alteration
Bidding
Baltimore, MD

HVAC Unit Removal and Installation
Post-Bid
Pikesville, MD

HVAC Maintenance and Repair Services
Post-Bid
Less than $50,000 est. value
Rosedale, MD 21237

Comprehensive Operations and Management and HVAC Maintenance for State Center Utility Plant
Term Contract
Results
Baltimore, MD 21201

Classroom HVAC Upgrade at Belmont Elementary School #217
Results
Baltimore, MD 21216

Eastern Technical High School Air Conditioning Project
Post-Bid
Essex, MD 21221

HVAC Upgrade at Edgewood Elementary School #67
Results
Baltimore, MD 21216

Install and Repair Heat Pump and Air Handler
Post-Bid
$250,000 to $500,000 est. value
Middle River, MD 21220

HVAC System Upgrade at Liberty Elementary School #64
Results
Baltimore, MD 21207

Replace Air Conditioning Units
Post-Bid
Baltimore, MD 21207

Chiller Replacement at Timber Grove Elementary School
Results
Owings Mills, MD 21117

Switchboard and Generator Upgrade
Post-Bid
Windsor Mill, MD 21244

Classroom Air Conditioning Upgrade at Mt. Royal Elementary/Middle School #66
Results
Baltimore, MD 21217

Chiller Maintenance, Baltimore County Facilities, Term Contract
Term Contract
Post-Bid
MD

Dust Collector Rental
Results
Baltimore, MD 21226

Last Updated 05/19/2021 08:11 AM
Project Title

Install A/C Split System at Parkville Armory

Physical Address View project details and contacts
City, State (County) Nottingham, MD 21236   (Baltimore County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, equipment, tools materials and supplies required for the installation of a mini-split system to provide A/C within office spaces at the Parkville Armory. Work will include start-up and providing training or the system to necessary personnel. Contractor is to provide a Hitachi VRF heat pump system; or approved equal, for a fully functioning A/C system. It will be two (2) separate systems, one for the right wing and one for the left wing of the facility. a. Outdoor Units – Two (2) 6 ton units capable of servicing eight (8) areas of the building and the ability to service more in the future. 1) Units are to be installed in areas for best function and approved by the Using Agency. Units are also to be installed in a fashion to keep them off the ground. b. Indoor Units – Number of units will depend on the capability of providing service to the requested eight (8) areas of the bldg. 1) All indoor units are to have drain pans, level sensors, drain pump kits and wall stats.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents