Similar Projects
Old Highway Road Water Main Extension - Sieppel and Radford Road Loop - City of Dubuque
Infrastructure
Conception
$768,375 est. value
Dubuque, IA 52099

Reconstruct Taxiway Alpha - 390-2842 - City of Dubuque
Alteration
Conception
$9,945,000 est. value
Dubuque, IA 52003

Big Grove Brewery Development
Renovation - 77,232 SF
Design
Des Moines, IA 50309

Plywood Trail - 459-321 - City Of Sioux City
Infrastructure
Design
Sioux City, IA

Ottumwa CSD Horace Mann Elementary School Improvements
Addition, Demolition, Renovation, Infrastructure
Bidding
$1,530,000 CJ est. value
Ottumwa, IA 52501

SE Des Moines Remedial Works - Pump Station Rehabilitation
Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Des Moines, IA 50315

Marion Public Services Maintenance Facility - Foundation Package
New Construction, Infrastructure - 12,000 SF
Sub-Bidding
$290,000 CJ est. value
Marion, IA 52302

Traffic Signals
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Spencer, IA 51301

LTC Building Demolition and Grading
Demolition, Infrastructure
Post-Bid
Grundy Center, IA

Mid-Sioux Opportunity Multi-Purpose Room Addition
Addition
Post-Bid
Cherokee, IA 51012

Installation of Shade Structures at Annie Wittenmyer Aquatic Center
New Construction
Results
Davenport, IA 52803

27th Street Corridor Site Work
Infrastructure
Results
$753,800 est. value
Cedar Falls, IA 50614

Bishop Mueller Complex
Addition - 6,500 SF
Construction
Sioux City, IA 51103

Tilt Studio Tenant Finish
Build-Out - 110,000 SF
Construction
Sioux City, IA 51106

Cottage Grove Avenue Ice Cream Shop
New Construction, Infrastructure - 1,241 SF
Pending Verification
$380,000 CJ est. value
Des Moines, IA 50311

Last Updated 07/22/2022 03:05 AM
Project Title

Riverside Concession Stand - City of Muscatine

Physical Address View project details and contacts
City, State (County) Muscatine, IA 52761   (Muscatine County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $275,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Riverside Concession Stand A detailed scope has not yet been determined This project is included in the city's 2020-2024 Capital Improvement Plan (CIP). As of July 22, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents