Similar Projects
Water Treatment Plant Upgrades Phase 2 - City of New Bedford
Renovation, Infrastructure
Conception
$16,012,500 CJ est. value
New Bedford, MA 02740

Replace Ozone System at the Russell F.Tennant Water Treatment Plant: Phase 1B, Construction - City of Attleboro
Renovation
Conception
$3,900,000 CJ est. value
Attleboro, MA 02703

Install a Granular Activated Carbon (GAC) Adsorption Treatment System - GC
New Construction, Infrastructure
Bidding
$7,271,000 CJ est. value
North Attleboro, MA 02760

Wastewater Treatment Facility Sand Filter Rehabilitation
Renovation
Bidding
$250,000 CJ est. value
Attleboro, MA 02703

McKeon WTF PFAS Treatment Facility - Sub
New Construction, Infrastructure
Sub-Bidding
$7,271,000 CJ est. value
North Attleboro, MA 02760

Grimaldi Pump Station and WWTF Improvements Project - General Bid
Renovation
Post-Bid
$525,000 est. value
North Attleborough, MA

FY23 Waste Water Treatment Facility Sludge Removal Services
Term Contract
Post-Bid
North Attleboro, MA 02760

WWTP Improvements Contract No. 2 Solids Processing Upgrade - General Bids
Renovation
Results
$40,000,000 est. value
Fall River, MA 02724

Wastewater Treatment Facility Chlorination System Conversion - File Sub-Bids
Infrastructure
Results
$650,000 est. value
North Attleborough, MA 02760

Replace West Bed Sand Filters at the Wading River Water Treatment Plant - City of Attleboro
Renovation
Conception
$380,000 CJ est. value
Attleboro, MA 02703

Furnishing and Installation of Photovoltaic System at the Somerset Water Treatment Facility - GC Bid
Renovation
Post-Bid
$1,500,000 CJ est. value
Somerset, MA 02726

Wastewater Treatment Facility Chlorination System Conversion - General Bid
Infrastructure
Results
$650,000 est. value
North Attleborough, MA 02760

Replace Wastewater Treatment Plant Facility Control Building Roof: Phase 2, Construction - City of Attleboro
Renovation
Conception
$860,000 CJ est. value
Attleboro, MA 02703

Wastewater Treatment Plant Upgrades
Renovation
Post-Bid
$750,000 CJ est. value
North Easton, MA 02356

Grimaldi Pump Station and WWTF Improvements Project - Filed Sub-Bids
Renovation
Results
$525,000 est. value
North Attleborough, MA

Last Updated 03/07/2023 02:03 AM
Project Title

Replace East Bed Sand Filters at the Wading River Water Treatment Plant - City of Attleboro

Physical Address View project details and contacts
City, State (County) Attleboro, MA 02703   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2027
Bids Due View project details and contacts
Estimated Value $574,750 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. This project is in included in the City's or County's FY 2024 - 2028 Capital Improvement Plan (CIP). As of March 07, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents