Similar Projects
Last Updated | 09/19/2023 02:10 PM |
Project Title | RFQ D/B-Bill Davis Stadium - Softball Field Video Infrastructure |
Physical Address | View project details and contacts |
City, State (County) | Columbus, OH 43210 (Franklin County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected January 2024 |
Bids Due | View project details and contacts |
Estimated Value | $618,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Ohio State University Baseball and Softball stadiums are in need of broadcast infrastructure upgrades. This project will add fiber cabling and broadcast infrastructure throughout both stadiums to support new replay requirements, camera locations, and broadcast connectivity within the stadiums. Construction will need to begin as soon as possible to achieve the desired completion date. Both Stadiums will be occupied during construction with OSU athletic teams, staff, and operations. The schematic, design development, and construction document phases of design were previously completed by the Criteria Architect/Engineer ("Criteria A/E"). The CD documents will be provided to the shortlisted Design-Builder("DB"). AOR services will still be needed for permitting, construction administrative services and post-construction services. The Program of Requirements ("POR") will be developed as a part of this project by the Criteria Architect/Engineer (" Criteria A/E). All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owner's policies and procedures. The Owner will be requesting a GMP as part of the Best Value selection process; therefore, self-performed work will be approved, subject to the firm submitting an acceptable subcontractor plan. The short-listed firms are treated as approved subcontractors for this purpose. There will be no obligation for the selected firm to solicit bids from subcontractors for the purpose of comparing the price of proposed self-performed work. In addition, the contingency utilization provisions related to the award of a low subcontractor bid are waived. The selected Design-Builder ("DB"), as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting uthority and/or Owner, the breakdown of the Agreement detailed cost components, to address the Owner's project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: develop and maintain estimates of probable construction cost, value engineering, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction Documents, Construction and Closeout stages. The schematic, design development, and construction document phases of design were previously completed by the Criteria Architect/Engineer ("Criteria A/E"). The CD documents will be provided to the shortlisted Design-Builder("DB"). AOR services will still be needed for permitting, construction administrative services and post-construction services. Construction Stage Notice to Proceed 01 / 24 Substantial Completion of all Work 03 / 24. DB Services Completed 04 / 24. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |