Similar Projects
Performing Arts Annex, Gymnasium & Athletic Turf Field
New Construction
Conception
$30,000,000 est. value
Chicago, IL 60618

Technology Center
New Construction
Conception
Less than $11,160,000 est. value
Robinson, IL

University of Chicago Wexford Tower
New Construction
Design
Chicago, IL

Shimer Square - Bennett & Hathaway Hall Rehabilitation
Renovation
Design
Mount Carroll, IL 61053

Cardinal Court Cypress Hall Flooring
Renovation - 36,428 SF
Bidding
Normal, IL 61761

Replace Campus Waterline
Infrastructure
Bidding
Less than $1,500,000 est. value
Carbondale, IL 62901

Capacity, Management, Operations, and Maintenance Plan (CMOM)
Term Contract
Post-Bid
Rock Island, IL 61201

Renovate Classroom 250 at Science and Engineering South - Bid Package - Division 01
Renovation
Post-Bid
Chicago, IL 60607

LC New Health and Education Building
- 17,644 SF
Results
Less than $5,000,000 est. value
Pontiac, IL 61764

Waterproofing
Renovation
Results
Palatine, IL 60067

The Illini Chabad Jewish Center
Renovation
Construction
$1,600,000 est. value
Champaign, IL 61820

Ubben Basketball Complex Expansion BP 2
Addition
Construction
Champaign, IL 61820

Harper College University Center Building
Pending Verification
$83,000,000 est. value
Palatine, IL 60067

Campus Development
New Construction
Pending Verification
Riverwoods, IL 60015

Allied Health Building
New Construction - 21,578 SF
Conception
Less than $7,047,100 est. value
Ina, IL 62846

Reported 12/08/2021 12:00 AM
Project Title

Commissioning Services for SDM Auditorium

Physical Address View project details and contacts
City, State (County) Alton, IL 62002   (Madison County)
Category(s) Education, Professional Services
Sub-Category(s) College/University, Commissioning
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Board of Trustees of Southern Illinois University governing Southern Illinois University Edwardsville (SIUE) hereby requests letters of interest and statement of qualifications from firms interested in providing third-party full commissioning services for the new SDM Auditorium on the Alton Campus. The A/E is presently involved in the Design Development stage and Cx participation in the process is required. The scope of this Commissioning Agent (CxA) contract includes LEED base and enhanced building commissioning services and building envelope commissioning services. The CxA will provide planning, design reviews, commissioning specifications, construction field inspections, functional performance testing and training, and warranty reviews for this project, which will be designed and built to obtain a minimum of LEED Silver. The following related criteria will be among those used to evaluate the firms and/or teams requesting consideration for selection: location of firm, assigned staff with prior experience with similar projects in size and complexity, approach to project commissioning, expertise in building systems and controls, staff size appropriate to the scope, related State experience, team structure, current workload, BEP status, LEED Professional Credentials for those assigned to the project, and history of accurate cost information. Proposals should include a complete description of the history, size and capabilities of the submitting firm and a list of projects which demonstrate the firm's level of experience. For each project indicate a knowledgeable reference (name, address and telephone number). As part of the submission, each team member must include a copy of the CDB Pre-qualification Certificate and a copy of their CDB 255 form. Attachments to the 255 form are allowed. This is not a CDB project. Faxed or electronic submittals will not be accepted. Interested firms need to submit only one copy of the attached forms (Financial Disclosure and Conflicts of Interest, Contract Certification, DHR Form, Insurance Checklist, Authority to Do Business in Illinois, State Board of Elections, etc.) and/or (Form A). A CD or some form of electronic format containing all of the information, including the forms, should be submitted in addition to the number of hard copies listed below. The electronic format is a requirement. BEP Goal: 20%

Details

1 College/University, 2 Stories Above Grade, 37,828 SF New Construction, Building.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents