Similar Projects
New Water Metering System Throughout the Village of Westfield
Infrastructure
Bidding
$200,000 est. value
Westfield, IL

Raw Water Transmission Main Surge Suppression at Ranney Wells
Infrastructure
Bidding
$815,000 est. value
Jacksonville, IL

Phase III Construction Engineering Services for McCormick Park Area Water Main Upgrade
Post-Bid
Crystal Lake, IL

Raw Water Intake Maintenance
Post-Bid
Winnetka, IL

Locust Street CSO Elimination and Water Main Replacement - Phase 2
Results
Bloomington, IL 61701

Lead Service Line Replacement
Results
Forrest, IL

Vetter Road Segment II Roadway Reconstruction & Realignment Drainage Improvements
Addition
Construction
Joliet, IL

Water Main Construction and Lead Service Line Replacement Pilot Project
Infrastructure
Bidding
$1,000,001 to $5,000,000 est. value
Chicago, IL

Water Main Installation Services
Post-Bid
Springfield, IL

Water System Improvements Division A: Watermain Replacement and Lead Service Removal and Replacement
Results
Less than $400,000 est. value
Moweaqua, IL

On-call PRVT Lead Service Line Replacement Program
Infrastructure
Bidding
Rockford, IL

Revise Domestic Water System - Division 01
Post-Bid
Chicago, IL 60612

Underground Utility Locating Service for Lake County Division of Transportation
Results
Waukegan, IL

TIF Water Main Replacement 2021
Infrastructure
Bidding
$300,000 est. value
Effingham, IL 62401

2021 On-Call Lead Water Service Line Replacement
Term Contract
Post-Bid
Joliet, IL

Last Updated 06/02/2022 12:40 AM
Project Title

Fast Avenue Water Main Extension

Physical Address View project details and contacts
City, State (County) Mackinaw, IL 61755   (Tazewell County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General Description of Work: The project location is located along Fast Ave. on the east side of Mackinaw. Work includes boring water main under Fast Ave. (44'), open cutting water main (138'), fire hydrant, and other collateral work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents