Similar Projects
SR 400 Express Lanes
Bidding
Less than $13,000,000 est. value

EP-177 Washington Road Sidewalks
Bidding
East Point, GA

LMIG 2019 Resurfacing of Sun Valley Subdivision
Post-Bid
East Point, GA

Lester Road Pedestrian Improvements
Post-Bid
Union City, GA 30291

Southern Region Disaster Recovery Support BPA
Results

2019 LMIG Street Resurfacing Project
Results
Atlanta, GA 30303

1200 Lake Hearn Medical Office Building Parking Lot Improvements
Renovation
Construction
Sandy Springs, GA

CVS #4717 Partial ADA Project
Renovation
Construction
$38,000 est. value
Atlanta, GA 30311

Alternative Intersection On-Call Contract
Bidding
$25,000 to $6,000,000 est. value
Atlanta, GA

Brady Mobility Facility Parking Lot Restriping
Post-Bid
Atlanta, GA

Sandy Springs Circle Streetscape from Hammond Drive to Mount Vernon Highway Project
Results
Sandy Springs, GA 30328

Hapeville CDBG Park Improvements
New Construction
Bidding
Hapeville, GA 30354

Buckhead CID West Village Streetscape Project
Post-Bid
Atlanta, GA 30301

Hot In Place Recycling Maintenance Activities
Results
Atlanta, GA 30303

Spout Springs ES Access Drive Modifications
Bidding
Flowery Branch, GA 30542

Last Updated 10/22/2020 08:11 AM
Project Title

GSU Stadium Road Development - Phase II

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30312   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $487,385
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Roadway and streetscape improvements to serve the newly created block. The existing parking lot facilities and associated infrastructure will be removed/demolished as required. Rough grade and final grade work will be required (main utilities have already been installed by a separate contract). New road paving, sidewalks, street lighting, landscaping, roadway striping are all part of the scope of work. Stormwater management for roadway only will be provided by the use of pervious pavers in the parallel parking bays on either side of Street F, a.k.a. Glenn St. Coordination with a separate residential/ retail developer to the North of new Glenn Street will be required.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents